Planning Permission Ireland
Part granted, part refusedExtensionDecided 10 March 2023

23, Eaton Square, Terenure, Dublin 6W, D06 NY77

Roof replacement and extension footprint reduction at 23 Eaton Square.

0052/23 · Dublin City Council · Lodged 13 February 2023

Reference
0052/23
Authority
Dublin City Council
Register status
Decided
Received
13 February 2023

Summary

AI-generated

The project involves replacing the existing roof with an altered profile to maximise daylight using high-level windows. Additionally, the existing extension footprint will be reduced from 38 sqm to 34 sqm by demolishing a rear utility room.

Extensionroofextensiondemolition
Floor area
34 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Expp: the development will include the replacement of the existing roof which needs to be replaced. The roof profile will be altered to incorporate and maximise daylight in the rear of the building. The proposed roof will be no higher than the existing ridge height of the current roof. The roof will introduce high level windows that will be placed at a 1 metre set-back from the boundary. The current extension of 38 m2 will reduce in footprint to 34 m2 with the demolition of the rear utility room.

Key dates

Timeline

  1. Application received13 February 2023
  2. Decision due10 March 2023
  3. Decision issued10 March 2023

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.