Not exempt — permission neededInfrastructureDecided 14 August 2023

Dublin Bus Phibsborough Garage, Prebend Street, Constitution Hill, Dublin 7, D07RC67

Installation of two single-storey prefabricated electrical E-Houses at Phibsborough Bus Garage.

0261/23 · Dublin City Council · Lodged 17 July 2023

Reference
0261/23
Authority
Dublin City Council
Register status
Decided
Received
17 July 2023

Summary

AI-generated

The proposal consists of two single-storey prefabricated steel E-Houses on concrete base slabs. The front 45 square metre structure will sit near the northern boundary, and the rear 56 square metre structure will sit near the south-eastern corner of this protected structure site.

Infrastructureinfrastructureelectricalbus depot
Storey
1
Floor area
101 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Expp: protected structure: the proposal for which section 5 declaration is sought (applied for a development of class 21 of part 1 of schedule 2 of the planning and development regulation, 2001, as already indicated) consists on 2 (front and rear) single storey e-houses that will have the following features: the front e-house is to be located at the entrance of the site, to the north boundary, beside the recently approved esb sub-station and mv and will be a 11,860 x 3,780mm single storey 45m² steel structure (prefabricated hitachi e-house), metal cladded and insulated to meet current relevant regulations and technical requirements, fixed onto a purpose-built reinforced concrete base slab. Adjacent esb substation and switch room were submitted under planning reference no. 3435/22, with final grant of permission obtained on 06.01.2021. The rear e-house is to be located near to the south-eastern corner of the subject site and will be a 14,860 x 3,780mm single storey 56m² steel structure (prefabricated hitachi e-house), metal cladded and insulated to meet current relevant regulations and technical requirements, fixed onto a purpose-built reinforced concrete base slab. Both proposed e-houses are to be painted/powder coated with matching colour as the newly adjacent esb substation, for consistency in order to reduce any visual impact. An e-house is defined for this application as an electrical equipment room, which could also be defined more extensively as: a modular walk-in assembled outdoor enclosure to house low to medium voltage switchgear and secondary electrical equipment.

Key dates

Timeline

  1. Application received17 July 2023
  2. Decision due14 August 2023
  3. Decision issued14 August 2023

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.