Planning Permission Ireland
Exempt — no permission neededInfrastructureDecided 14 August 2023

Dublin Bus, Summerhill Bus Depot, Mountjoy Place, Dublin 1, D01 EY86.

Installation of a single-storey prefabricated electrical E-House at Summerhill Bus Depot.

0262/23 · Dublin City Council · Lodged 17 July 2023

Reference
0262/23
Authority
Dublin City Council
Register status
Decided
Received
17 July 2023

Summary

AI-generated

The application seeks a declaration for a 56 square metre single-storey prefabricated steel E-House. The structure will be located at the north-eastern corner of the site on a concrete base slab, adjacent to an approved ESB substation.

Infrastructureinfrastructureelectricalbus depot
Storey
1
Floor area
56 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Expp: the proposal for which section 5 declaration is sought (applied for as a development of class 21 of part 1 of schedule 2 of the planning and development regulation, 2001, as already indicated) consists on one single storey e-house that will have the following features: 14,855 x 3,785mm single storey 56m2 steel structure (prefabricated hitachi e-house) metal cladded and insulated to meet current relevant regulations and technical requirements, fixed onto a purpose-built reinforced concrete base slab. To be located at the most north-eastern corner of the site, beside the recently approved esb sub-station and mv switch room (planning reference no. 3434/22 with final grant of permission dated 09.06.2022). It is to be painted/powder coated with similar colour as the newly adjacent esb substation, for consistency. An e-house is defined for this application as an electrical equipment room, which could also be defined more extensively as: a modular walk-in assembled outdoor enclosure to house low to medium voltage switchgear and secondary electrical equipment. As already explained above, this plant is proposed as an addition to allow the improvement of the existing industrial process on site.

Key dates

Timeline

  1. Application received17 July 2023
  2. Decision due14 August 2023
  3. Decision issued14 August 2023

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.