39, Mountjoy Square South, Dublin 1
Structural repairs, roof works, and internal upgrades to a protected structure on Mountjoy Square.
0336/22 · Dublin City Council · Lodged 28 March 2023
- Reference
- 0336/22
- Authority
- Dublin City Council
- Register status
- Decided
- Received
- 28 March 2023
Summary
AI-generatedThe proposed works to this protected structure include structural repairs to the rear return, roof repairs including asbestos tile removal, and window restoration. Internal works involve removing non-original partitions and suspended ceilings, upgrading bathrooms and kitchenettes, and rewiring.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Expp: protected structure
- Structural repairs to rear return including dismantled brick parapet, unstable internal masonry wall and arched opening to rear
- Repair works to roof to include local repairs, the removal and safe disposal of asbestos roof tiles and replacement with natural slates and upgrade of existing linings and flashings to copper
- Removal of vegetation to external walls, roof and gutters
- Repair existing windows and ensure they can open and close freely, including replacement of broken panes of glass
- Removal of non-original stud partition walls to existing apartments at second and third floor levels
- Removal of non-original suspended ceiling at basement level
- Upgrade of existing bathroom facilities in existing locations, utilising existing service routes only
- Upgrade of existing kitchenette facilities in existing locations, utilising existing service routes only
- Strip out of redundant services without disturbing the existing building fabric
- Rewire within existing ducts and runs
- Upgrade of electrical circuits
- Replacement of existing gas boilers
- Repair of timber ceiling and floor joists
- Provision of fire upgrade works to existing timber floors as indicated
- Making good of original plasterwork, cornicing, wall detailing and skirting's by specialist
Key dates
Timeline
- Application received28 March 2023
- Decision due18 April 2023
- Decision issued18 April 2023
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Part granted, part refusedAlterations
EXPP: PROTECTED STRUCTURE: i. Upgrade of existing bathroom facilities in existing locations, utilising…
46 Cabra Road, Dublin 7
0269/24Dublin CityLodged 10 Sept 2024
- Part granted, part refusedAlterations
EXPP: PROTECTED STRUCTURE: External Works — Slate and valley repair to roof
30, Merrion Square North, Dublin 2
0164/23Dublin CityLodged 21 Feb 2024
- Part granted, part refusedAlterations
PROTECTED STRUCTURE: EXPP: Internal Works — Removal of non-original stud partitions, built in furniture,…
6, Wilton Place, Dublin 2
0414/22Dublin CityLodged 31 Jan 2023
- Not exempt — permission neededAlterations
EXPP: PROTECTED STRUCTURE: To reinstate existing use & layout. Proposed Works. The works proposed include…
74, North Circular Road, Dublin 7
0080/24Dublin CityLodged 1 Mar 2024
- Exempt — no permission neededAlterations
EXPP: PROTECTED STRUCTURE: Upgrade of existing bathroom facilities in existing locations, utilising existing…
49 Leinster Road, Rathmines, Dublin 6
0358/22Dublin CityLodged 15 Feb 2023
- Part granted, part refusedAlterations
EXPP: PROTECTED STRUCTURE: Localised repairs and replacement of windows. Replace existing kitchen units.…
4, North Circular Road, Stoneybatter, Dublin 7
0140/23Dublin CityLodged 23 Apr 2023
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.