Planning Permission Ireland
Not exempt — permission neededAlterationsDecided 26 March 2024

74, North Circular Road, Dublin 7

Reinstatement of use and layout with extensive repairs to a protected structure.

0080/24 · Dublin City Council · Lodged 1 March 2024

Reference
0080/24
Authority
Dublin City Council
Register status
Decided
Received
1 March 2024

Summary

AI-generated

The proposed works to this protected structure include fireproofing floors and ceilings, replacing non-original windows and doors, and stabilizing the stairs and external ironmongery. It also involves roof repairs, plaster repairs, and ceiling replacement due to water damage.

Alterationsprotected structurerefurbishmentrepairs

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Expp: protected structure: to reinstate existing use & layout. Proposed works. The works proposed include (incorporating statutory building regulation requirements) - the fire proofing of the floors and ceilings. - replacement of windows and (internal non original) doors, and front door. - internal door leafs (none original) to meet fire regulations but retention of all architraves etc. - replacement of all services reusing all existing service runs new fire alarm system suitable to the use of the building. - re-leading and upgrading of all valleys, parapets and gutters. There will be a consideration given to the installation of a hopper and downpipe to the front of the building in the interests of preservation of the terrace as a whole and the longevity of the roofs. - investigation and replacement, including allowances for emergency over-topping to the internal valley gutters/drainage. - stabilisation of the stairs. - stabilisation of the external ironmongery. - plaster repairs to walls impacted by water damage. - replacement of the ceiling in the front main reception room. - due to structural damage and delamination of the ceiling, it will be impossible to lift floor boards to fire proof the ceiling without ceiling failure due to rotten laths and joists. - lifting of first floor generally for fire proofing and stabilisation of ceilings where required (tie backs/securing ceiling laths).

Key dates

Timeline

  1. Application received1 March 2024
  2. Decision due28 March 2024
  3. Decision issued26 March 2024

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.