Not exempt — permission neededAlterationsDecided 2 September 2025

60 Baggot Street Lower, Dublin 2

Roof repairs and leadwork replacement at a protected structure on Baggot Street Lower.

0350/25 · Dublin City Council · Lodged 10 August 2025

Reference
0350/25
Authority
Dublin City Council
Register status
Decided
Received
10 August 2025

Summary

AI-generated

The proposed works involve stripping and replacing existing slates, removing inappropriate asphalt finishes, and renewing valley boards. It also includes installing new lead flashing and breathable roof membranes on a protected structure.

Alterationsheritageroofingrepair

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Expp: protected structure: summary of works
  • Stripping and removing existing slates and ridges tiles
  • Removal of inferior and inappropriate flat roof asphalt roof finish to the existing roof valleys
  • Removal of old and poorly detailed slate and lead/copper flashing to the chimney and parapet upstands
  • Subject to investigation, removal of the sub-base under the asphalt finish to expose the original valley base
  • Subject to investigation to renew completely the original valley boards and supports if found to be rotten or defective
  • Subject to risk assessment, access and practicality to temporarily lift existing granite capping to provide for renewal of the lead flashing and re-bed the capping
  • Subject to inspection to remove the existing slate battens and roof felt/lime parging
  • To provide for repair and preservative treatments of the existing roof joist, joist ends and roof timbers
  • New breathable roof membrane, with new treated slate battens
  • New replacement natural stone roof slates and re-used existing ridge tiles
  • New stepped lead flashing or copper to new refurbished valleys
  • New lead flashing to parapet and chimney upstands
  • Repair and reinstatement of the existing dormer roof access

Key dates

Timeline

  1. Application received10 August 2025
  2. Decision due5 September 2025
  3. Decision issued2 September 2025

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.