Planning Permission Ireland
RefusedAlterationsDecided 15 March 2019

The Spencer Hotel, North Wall Quay, I.F.S.C., Dublin 1

Installation of new colour-changeable building lighting on the hotel's south and west elevations.

2084/19 · Dublin City Council · Lodged 21 January 2019

Reference
2084/19
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
21 January 2019

Summary

AI-generated

The development consists of installing various building lighting measures on the south-facing and west-facing elevations of the hotel. This includes narrow beam downlights, uplights, linear lighting, and LED neon flex lighting, all of which will be colour-changeable.

Alterationshotellightingifsc

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of a number of building lighting measures to the north wall quay (south facing) elevation and to the excise walk (west facing) elevation of the hotel building. These include: narrow beam downlights (4 no. ) at ground floor level on the south elevation (north wall quay); narrow beam uplights (6 no. ) located above the ground floor level on the south elevation (north wall quay); linear narrow beam lighting at ground floor on the south elevation (north wall quay); led neon flex lighting at 1st-5th floor levels on the south elevation (north wall quay) and west elevation (excise walk); all of the proposed lighting is to be colour changeable.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 3 Block 3, Clarion Quay, IfscJul 2025€340,00045 m
Apt 10, Clarion Quay, North Wall Quay Dublin 1May 2026€655,00048 m
Apt 9 Block 6, Clarion Quay, Excise Walk Ifsc North WallJul 2026€380,00090 m
Apt 7 Block 6, Clarion Quay, North Wall Quay Dublin 1Jul 2025€380,00090 m
Apt 16 Block 7, Clarion Quay, Mayor St Dublin 1not full market priceFeb 2025€160,00092 m
Apt 12 Block 7, Clarion Quay Apts, Ifsc Dublin 1Feb 2025€418,00092 m
Apt 1.1, National College Of Ireland, Mayor StDec 2025€50,648,130102 m
Apt 4 Block 12, Mayor St, I F S C Dublin 1Mar 2025€285,000115 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received21 January 2019
  2. Decision due15 March 2019
  3. Decision issued15 March 2019
  4. Appeal submitted16 April 2019
  5. Appeal decided4 July 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.