Planning Permission Ireland
GrantedCommercialDecided 19 October 2020

25-28, North Wall Quay, Dublin 1

Refurbishment and extension of an office building on North Wall Quay, adding two new floors.

3245/20 · Dublin City Council · Lodged 25 August 2020

Reference
3245/20
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
25 August 2020

Summary

AI-generated

The development comprises the refurbishment of an existing six-storey office building, including a new facade. It features extensions at the ground and fifth floors, and the addition of two new storeys to increase the overall height to eight storeys.

Commercialofficeextensionrefurbishment
Storeys
8

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Planning permission for development on a site of c. 0.39ha. At 25-28 north wall quay, dublin 1, d01 h104. The site is bound by national college of ireland to the north, north wall quay to the south, aig ireland to the east and spencer hotel to the west. The proposed development comprises of the following
  • Refurbishment of the existing 6 no. Storey building to provide for a new façade treatment to all elevations and all associated demolitions as a result
  • Infill and extension of the building along the southern boundary resulting in an additional c. 668sqm
  • Extension to office accommodation at ground floor level to the western side of the building comprising c. 150sqm
  • Infill of existing accessible terrace at 5th floor level on the northern elevation c. 119sqm
  • Provision of 2 no. Additional floors (3,690sqm) increasing the overall height of the building from 6 no. Storeys (23.67m) to 8 no. Storeys (31.7m). The 6th floor level will be set back from the southern elevation and the 7th floor will be set back from all elevations
  • Amendments to the ground floor layout to provide for a revised double height entrance lobby to the office to the south of the building
  • Amendments to the internal layouts of the office floorspace and provision of new glazed atrium feature at roof level
  • Amendments to basement level to provide for a reconfiguration of the car parking spaces resulting in a reduction from 98 no. To 69 no. , 177 no. Cycle parking spaces and 24 no. Visitor cycle parking spaces, new shower and locker rooms, plant rooms and store rooms. Access to basement level will remain unchanged
  • Provision of 1 no. “a&l goodbody” entrance sign comprising of stainless steel internally illuminated individually mounted lettering to the south elevation and 1 no. “a&l goodbody” façade sign at 6th floor level on the south elevation in the eastern corner comprising of perspex lettering with led light tape backing
  • Alterations to the hard and soft landscaping, suds drainage, pv panels, provision of plant at basement and roof level, accessible terraces at 6th floor (south elevation) and 7th floor level (north and south elevations), green roofs and all other associates site development works necessary to facilitate the development. The proposed development will result in an increase in gross floor area from 15,798sqm (including basement of 3,708sqm) to 21,065sqm (including basement of 3,708)

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 3 Block 3, Clarion Quay, IfscJul 2025€340,00090 m
Apt 10, Clarion Quay, North Wall Quay Dublin 1May 2026€655,00095 m
Apt 1.1, National College Of Ireland, Mayor StDec 2025€50,648,130101 m
Apt 9 Block 6, Clarion Quay, Excise Walk Ifsc North WallJul 2026€380,000116 m
Apt 7 Block 6, Clarion Quay, North Wall Quay Dublin 1Jul 2025€380,000116 m
Apt 12 Block 7, Clarion Quay Apts, Ifsc Dublin 1Feb 2025€418,000127 m
Apt 16 Block 7, Clarion Quay, Mayor St Dublin 1not full market priceFeb 2025€160,000127 m
5 Dargle House, Custom House Sq, Mayor St Dublin 1Jun 2025€445,000145 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received25 August 2020
  2. Decision due19 October 2020
  3. Decision issued19 October 2020
  4. Grant issued1 December 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.