Planning Permission Ireland
RefusedCommercialDecided 12 April 2018

The North Star Hotel, 27, Amiens Street, Dublin 1

Construction of two additional floors on the North Star Hotel to provide 36 new bedrooms.

2323/18 · Dublin City Council · Lodged 16 February 2018

Reference
2323/18
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
16 February 2018
Floor area
36 m²

Summary

AI-generated

Planning permission is sought at Block B of the North Star Hotel, a protected structure. The development involves adding two floors over the existing seven-storey building to create a nine-storey building, providing 36 new hotel bedrooms and a new lift shaft.

Commercialhotelextensionprotected structure
Storeys
9

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: planning permission is sought for development at 'block b' of the north star hotel involving (i) the construction of 2 no. Additional floors (1254 sqm) over the existing 7 storey building bringing it to 9 stories high and a total building height of 27.53m, providing 36 new hotel bedrooms; (ii) associated elevational changes to the facades of 'block b' (iii) the inclusion of a lift shaft for building regulations and fire safety purposes and minor internal amendments to accommodate this on all existing floors of 'block b' in addition to an external fire escape door to the foley street elevation and any ancillary contingent works to facilitate this development.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 21 August 2019. A completion certificate was lodged on 1 March 2022.

Notified floor area: 1,254

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 2 - Second Floor, 36 Amiens St, Dublin 1Oct 2025€235,00039 m
Apt 8, Montgomery Court, Foley St Dublin 1Mar 2026€355,00044 m
Apt 37, The Millhouse, Foley St Dublin 1Sept 2025€300,00055 m
Apt 4, The Millhouse, Steelworks Dublin 1Jul 2026€271,00055 m
Apt 24 Montgomery Court, Foley St, Dublin 1May 2026€370,00057 m
Flat 1, 46 Talbot Street, Dublin 1Mar 2025€535,00064 m
24 The Millhouse Block C, The Steelworks, Foley St Dublin 1Nov 2025€387,00067 m
Apt 10, The Atrium, Foley St Dublin 1Apr 2025€279,00089 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received16 February 2018
  2. Decision due12 April 2018
  3. Decision issued12 April 2018
  4. Grant issued20 November 2018
  5. Appeal submitted15 May 2018
  6. Appeal decided20 November 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.