Planning Permission Ireland
GrantedAlterationsDecided 30 April 2021

site of c. 0.1928 hectares on the corner of Middle Abbey Street and Liffey Street Upper, Dublin 1

Amendments to a hotel under construction on Middle Abbey Street to replace a ground floor office with a new fire escape stairwell.

2344/21 · Dublin City Council · Lodged 8 March 2021

Reference
2344/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
8 March 2021

Summary

AI-generated

The proposed development consists of amendments to a permitted hotel development currently under construction. It involves omitting a front office space at ground floor level and replacing it with a new fire escape stairwell serving levels 00 to 02 at the eastern elevation, resulting in an additional 29.5 sqm of floor area.

Alterationshotelcity centreamendment
Floor area
30 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Planning permission for development at a site of c. 0.1928 hectares on the corner of middle abbey street and liffey street upper incorporating the following demolished buildings: nos. 1, 2, 3/4, 5 & 6 liffey street upper; nos. 111-114 middle abbey street; structures to the rear of nos. 108-109 middle abbey street; and hotel yard, dublin
  • The proposed development will consist of amendments to a permitted hotel development currently under construction (dcc reg. Ref. 3697/17) to include the omission of a front office space at ground floor level and its replacement with a new fire escape stairwell to serve ground floor and second floor levels (levels 00-02) inclusive, at the eastern (rear) elevation of the hotel building. The proposed development will result in an additional gross internal floor area of 29.5 sqm

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 1, 94 Middle Abbey St, Dublin 1May 2026€2,000,000111 m
213 Bachelors Walk, Dublin 1, DublinApr 2025€262,000122 m
Apt 215 Bachelors Walk, Norths Lotts, Dublin 1Jul 2026€257,000122 m
219 Bachelors Walk Apts, Dublin 1Oct 2025€254,000123 m
265 Bachelors Walk, Dublin 1, DublinMar 2025€305,000127 m
303 The Lotts, Bachelors Walk, Dublin 1Dec 2025€250,000130 m
198 Bachelors Walk, Dublin 1, DublinMar 2026€260,000134 m
Apt 307, Bachelors Walk, Dublin 1Mar 2026€293,500134 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 March 2021
  2. Decision due30 April 2021
  3. Decision issued30 April 2021
  4. Grant issued15 June 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.