Planning Permission Ireland
GrantedAlterationsDecided 15 July 2020

The Museum Building, Trinity College, The University of Dublin, College Green, Dublin 2

Roof repair works to the Museum Building at Trinity College, a protected structure.

2677/20 · Dublin City Council · Lodged 7 May 2020

Reference
2677/20
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
7 May 2020

Summary

AI-generated

Full planning permission is sought for roof repair works to the Museum Building at Trinity College, which is a protected structure. Works include replacing the slate finish and copper work to outer pitches, replacing glazing and flashings to linear rooflights, and repairing chimneys.

Alterationsprotected structureheritageroof repairs

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: full planning permission is sought for roof repair works to the museum building at trinity college; a protected structure reference 2003 on the record of protected structures as follows: - replacement of slate finish to outer pitches, - replacement of all copper work to outer pitches, - replacement of glazing, glazing bars, glazing fixings & flashings to linear rooflights, - repairs to chimneys to outer pitches at the museum building.

Land-use zoning

What this land is zoned for

Z8: Georgian Conservation Areas
To protect the existing architectural and civic design character, and to allow only for limited expansion consistent with the conservation objective.

National zoning type: General

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 14 April 2021.

Notified floor area: 1,200

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
14 College Close, Tara St, Dublin 2Nov 2025€320,000210 m
38 Trinity Plaza, Pearse St, Dublin 2Jun 2026€394,000215 m
33 Trinity Plaza, Tara St, Dublin 2Jul 2025€250,000215 m
46 Trinity Plaza, Tara St, Dublin 2Apr 2026€475,000215 m
25 Trinity Plaza, Townsend St, Dublin 2Aug 2025€518,000215 m
Apt B, 116 Grafton Street, Dublin 2May 2026€660,000275 m
43 Hyde Court, Townsend St, Dublin 2Nov 2025€520,000290 m
65 Hyde Court, Townsend Street, Dublin 2Nov 2025€370,000290 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 May 2020
  2. Decision due17 July 2020
  3. Decision issued15 July 2020
  4. Grant issued27 August 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.