Planning Permission Ireland
GrantedApartmentsDecided 23 October 2020

Harbour Court, to the rear of 31 Lower Abbey Street, Dublin 1

Construction of a new four-storey residential development above an existing ground floor to create three apartments.

2900/20 · Dublin City Council · Lodged 22 June 2020

Reference
2900/20
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
22 June 2020

Summary

AI-generated

The development will consist of a new four-storey structure built above the existing ground floor. It will contain one 1-bedroom apartment on the first floor, one 1-bedroom apartment on the second floor, and one 2-bedroom duplex apartment across the third and fourth floors. Access to all units will be provided through 31 Lower Abbey Street.

Apartmentsapartmentsurban infill
Residential units
3
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission for construction of new 4 storey residential development above existing ground floor consisting of 1 bedroom apartment at 1st floor level, 1 bedroom apartment at 2nd floor level & 2 bedroom duplex apartment at 3rd and 4th floor level. All apartments are accessed from no. 31 lower abbey street.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
110 Marlborough Street, Dublin 1Jun 2025€270,00015 m
Apartment 401, 5 - 9 Eden Quay, Dublin 1Nov 2025€490,00071 m
Apt 330, Bachelors Walk, DublinFeb 2025€285,000141 m
Apt 3 Abbey Court Apts, Irish Life Centre, Abbey St Lower Dublin 1Aug 2025€265,000141 m
Apartment 16, Abbey Court Apartments, Lower Abbey StreetJul 2025€285,000141 m
2 Abbey Court Apts, Irish Life Centre, Abbey St Lower Dublin 1Nov 2025€260,000141 m
13 Abbey Court Apts, Irish Life Centre, Abbey St Lower Dublin 1Dec 2025€260,000141 m
31 Batchelors Walk, Ashbourne, Co. MeathSept 2025€486,000174 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 June 2020
  2. Further information requested14 August 2020
  3. Further information received29 September 2020
  4. Decision due23 October 2020
  5. Decision issued23 October 2020
  6. Grant issued19 April 2021
  7. Appeal submitted23 November 2020
  8. Appeal decided19 April 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.