Planning Permission Ireland
InvalidChange of useDecided 14 July 2022

109 Marlborough Street, Dublin 1

Conversion of a protected public house to retail and three apartments, including a new four-storey rear extension.

4440/22 · Dublin City Council · Lodged 8 July 2022

Reference
4440/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
8 July 2022

Summary

AI-generated

The project involves the demolition of non-original rear structures and the construction of a four-storey rear extension. The protected building will be converted from a public house to retail services on the lower floors and three 1-bedroom apartments on the upper floors.

Change of useapartmentsprotected structurepub conversiondemolition
Residential units
3
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: the development will consist of : demolition of non-original structures to the rear including rear wall, cantilevered structures and external fire escape stairs; construction of 4-storey extension to the rear; change of use from public house to retail/non-retail services at basement and ground floor level and to residential at first, second and third floor levels to accommodate 3 no. 1-bed apartments; associated internal alterations and repairs to roof; reinstatement of fenestration above street level; new shopfront at street level; bin and bicycle storage at ground level accessed from the rear; all associated site works and services

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 28 March 2023. A completion certificate was lodged on 16 January 2025.

Notified floor area: 274.5

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
110 Marlborough Street, Dublin 1Jun 2025€270,0007 m
Apartment 401, 5 - 9 Eden Quay, Dublin 1Nov 2025€490,00084 m
2 Abbey Court Apts, Irish Life Centre, Abbey St Lower Dublin 1Nov 2025€260,000127 m
Apartment 16, Abbey Court Apartments, Lower Abbey StreetJul 2025€285,000127 m
13 Abbey Court Apts, Irish Life Centre, Abbey St Lower Dublin 1Dec 2025€260,000127 m
Apt 3 Abbey Court Apts, Irish Life Centre, Abbey St Lower Dublin 1Aug 2025€265,000127 m
Apt 330, Bachelors Walk, DublinFeb 2025€285,000157 m
Apt 21, 2 Georges Quay, Dublin 2May 2025€431,000182 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 July 2022
  2. Decision due1 September 2022
  3. Decision issued14 July 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.