Planning Permission Ireland
GrantedAlterationsDecided 13 August 2021

Hibernian Cottage, Acres Road, Phoenix Park, Chapelizod, Dublin 8

Refurbishment and conservation of a protected single-storey cottage in Phoenix Park.

3011/21 · Dublin City Council · Lodged 22 June 2021

Reference
3011/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
22 June 2021

Summary

AI-generated

The application seeks permission for the refurbishment and conservation of Hibernian Cottage, a detached single-storey protected structure. Works include floor insulation, timber floor repairs, plaster stabilization, mechanical and electrical upgrades, and a new kitchen and bathroom fit-out.

Alterationsconservationheritagerefurbishment
Storey
1
Floor area
171 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: planning permission is sought for the refurbishment and convservation of hibernian cottage (ridge height circa 7 meters above ground level), a detached single-storey dwelling, with two-storey return to rear, consisting of ground floor (88 sqm), first floor (38 sqm) over basement (45 sqm) (no. 6754 on the record of protected structures) as follows
  • Installation of insulation to underside of timber flooring void in raised ground floor and first floor rooms over basement, also to attic space/roof void
  • Existing floor tiles in kitchen to be repaired and re-laid over new platon basement waterproof tanking membrane
  • Repair, sand and varnish all timber flooring
  • Repair works to plaster-stabilize ceiling using stainless steel screws and washers and lime float coat to produce an even surface
  • Painting and decorating to walls and ceilings throughout
  • New bathroom fitings, new kitchen and utility fit-out
  • Doors to be refurbished and ironmongery re-conditioned
  • Mechanical upgrades to include installation of new heating system and radiators, new electrical wires and services throughout
  • New concrete slab to external areas and laneway, boundary paths to be replaced on a like for like basis

Land-use zoning

What this land is zoned for

Z9: Amenity/Open Space Lands/Green NetworkOS
To preserve, provide and improve recreational amenity, open space and ecosystem services.

National zoning type: Mixed/general 'green'/recreation/conservation, other

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 18 March 2024.

Notified floor area: 171

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 June 2021
  2. Decision due16 August 2021
  3. Decision issued13 August 2021
  4. Grant issued24 September 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.