Pigeon House Road, Dublin 4, D04 FP28
Demolition of existing structures and construction of new industrial plant and silos.
3041/24 · Dublin City Council · Lodged 15 January 2024
- Reference
- 3041/24
- Authority
- Dublin City Council
- Register status
- Decided
- Type
- Permission
- Received
- 15 January 2024
Summary
AI-generatedThe development consists of constructing new plant machinery, including silos, a blender, a compressor room, and storage. It also includes the demolition of several existing structures and retention permission for existing silos, an office, and a laboratory.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Permission & retention : permission for development consisting of the construction of plant, comprising silos and blender, compressor room, cooling tank and pump room, storage, feed conveyors, retaining walls, new palisade fencing encompassing an increased site area, incorporating both a new vehicular sliding access gate, replacing the existing vehicular swing gates and the repositioning of the existing vehicular exit gate, creating a new vehicular entrance to the east of the site, revision of car park layout, together with associated site works. Retention permission is also sought for silos, office and laboratory together with permission for the demolition of structures, both permanent and temporary to include cooling tanks, compressor room, mill feed, silo and blender, retaining wall and palisade fencing and wall.
Land-use zoning
What this land is zoned for
“To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.”
National zoning type: General industry
Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planKey dates
Timeline
- Application received15 January 2024
- Decision due13 August 2024
- Decision issued12 August 2024
- Permission expiry7 November 2029
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- InvalidAt this site
RETENTION & PERMISSION: Permission for development consisting of the construction of plant, comprising silos…
Pigeon House Road, Dublin 4, D04 FP28
4853/23Dublin CityLodged 27 Nov 2023Industrial
- Granted120 m away
Demolition of existing two-storey administration building (534 sq.m); construction of a new two-storey…
The Hammond Lane Metal Company Ltd., Pigeon House Road, Ringsend, Dublin 4
2130/18Dublin CityLodged 24 Jan 2018Industrial
- Granted140 m away
Permission is sought for development that will consist of: construction of a bridge to span the existing…
Lands at Berth 47A, adjacent to Pigeon House Road, Dublin 4, north of the Ringsend Wastewater Treatment Works.
3711/18Dublin CityLodged 10 Aug 2018Infrastructure
- Granted250 m away
PERMISSION The development will consist of a 220kV underground cable measuring approximately 4.0m in length,…
Adjacent to the National Oil Reserve Agency (NORA), Ringsend oil farm, Shellybanks Road, Dublin, Co. Dublin
WEB1558/24Dublin CityLodged 7 May 2024Infrastructure
- Invalid250 m away
The development will consist of a 220kV underground cable measuring approximately 4.0m in length, from the…
adjacent to the National Oil Reserve Agency (NORA) Ringsend oil farm, Shellybanks Road, Dublin, Co.
WEB1509/24Dublin CityLodged 26 Apr 2024Infrastructure
- Granted270 m away
PROTECTED STRUCTURE: permission for a single storey sorting building and canopy to the rear of the site of…
84 Pigeon House Road, Ringsend, Dublin 4
3417/23Dublin CityLodged 22 Mar 2023Industrial
- Invalid270 m away
PROTECTED STRUCTURE: PERMISSION: For a sorting building at their construction and demolition recycling…
84, Pigeon House Road, Ringsend
3249/23Dublin CityLodged 22 Feb 2023Industrial
- Granted360 m away
Permission for development on this site at the Ringsend Waste Water Treatment Plan, located on Pigeon House…
Ringsend Waste Water Treatment Plan, Pigeon House Road, Ringsend, Dublin 4
5319/22Dublin CityLodged 30 Nov 2022Infrastructure
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- InvalidIndustrial
RETENTION & PERMISSION: Permission for development consisting of the construction of plant, comprising silos…
Pigeon House Road, Dublin 4, D04 FP28
4853/23Dublin CityLodged 27 Nov 2023
- GrantedIndustrial
Retention & Permission for a development consisting of permission for alterations to a development approved…
Condon Engineering , Collon Business Park , Ballyboni
18222LouthLodged 23 Mar 2018
- GrantedRetention
For retention permission and permission for the following (A) Retention is sought for: (I). Changes to the…
The Athlone Laboratories Facility , Ballymurray Td. , Roscommon
19407RoscommonLodged 12 Aug 2019
- GrantedRetention
(1)Retention Permission for the installation of 4 no. agricultural storage silos and the erection of 2 no.…
Grange Lower , Goresbridge , Co. Kilkenny
19874KilkennyLodged 22 Nov 2019
- GrantedIndustrial
Permission/Permission for retention of waste water treatment plant including a control house, associated…
Sand Quay, Clonakilty, Co Cork,
17478corkLodged 18 Jul 2017
- Awaiting decisionIndustrial
Development which will consist of an extension to the existing northern elevation to allow for the expansion…
Zone C , Mullingar Business Park , Mullingar Co. Westmeath
2660295WestmeathLodged 4 Jun 2026
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.