Planning Permission Ireland
GrantedInfrastructureDecided 30 January 2023

Ringsend Waste Water Treatment Plan, Pigeon House Road, Ringsend, Dublin 4

Construction of a combined heat and power engine and steam generator at Ringsend Wastewater Treatment Plant.

5319/22 · Dublin City Council · Lodged 30 November 2022

Reference
5319/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
30 November 2022

Summary

AI-generated

The development at the Ringsend Wastewater Treatment Plant consists of two new units comprising a Combined Heat and Power Engine and a Steam Generator unit. Both units will feature rooftop plant areas and have an overall height of approximately 5.8 metres.

Infrastructureenergyinfrastructureutility
Floor area
60 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development on this site at the ringsend waste water treatment plan, located on pigeon house road, ringsend, dublin
  • The proposed development consists of 2 no. Units comprising a combined heat and power engine and steam generator unit with roof top plant areas; the combined heat and power unit has gross floor area of approximately 30sq m, and a height of approximately 2.6 m. The rooftop plant area will have a height of approximately 3.2m giving an overall height of approximately 5.8m. The steam generator unit has a gross floor area of approximately 30 sq m, and a height of approximately 2.6 m; the rooftop plant area will have a height of approximately 3.2m giving an overall height of approximately 5.8m. All associated site works and utility connections

Land-use zoning

What this land is zoned for

Z7: Employment (Heavy)SI
To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.

National zoning type: General industry

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received30 November 2022
  2. Decision due2 February 2023
  3. Decision issued30 January 2023
  4. Permission expiry27 April 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.