Planning Permission Ireland
GrantedCommercialDecided 6 March 2024

28A Anglesea Road, Ailesbury Grove, Donnybrook, Dublin, D04 W6Y3

Extension of a rear terrace and construction of a new scrummage room.

3059/24 · Dublin City Council · Lodged 18 January 2024

Reference
3059/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
18 January 2024

Summary

AI-generated

The development includes extending the rear terrace by approximately 141 square meters and constructing a new scrummage room. It also features a new splayed pitch entrance with concrete stairs, a new balcony, and glazed screen doors.

Commercialsports clubterraceextension
Floor area
141 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The development will consist of
  • Extension of terrace to rear of development approx area: 141 sq m
  • New scrummage room w. Existing store removed and new double doors fitted to allow pitch access
  • New splayed pitch entrance with two no. Concrete access stairs to terrace above
  • New balcony, balustrade to match existing
  • Removal of first floor window to "tony o reilly room" & replaced with new full height glazed screen and door

Land-use zoning

What this land is zoned for

Z9: Amenity/Open Space Lands/Green NetworkOS
To preserve, provide and improve recreational amenity, open space and ecosystem services.

National zoning type: Mixed/general 'green'/recreation/conservation, other

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apartment 22, Simmonscourt Castle, Simmonscourt RoadApr 2026€530,000161 m
28 Ailesbury Dr, Ballsbridge, DublinMay 2026€2,250,000164 m
6 Shrewsbury Gardens, Ballsbridge, Dublin 4price excludes VATMar 2025€3,964,758169 m
4 Main House, Simmonscourt Castle, Simmonscourt RoadMar 2026€1,300,000186 m
2 Ailesbury Grove, Donnybrook, Dublin 4Apr 2025€2,025,000187 m
78 Ailesbury Rd, Ballsbridge, Dublin 4Feb 2025€2,100,000204 m
2 Shrewsbury Gardens, Ballsbridge, Dublin 4price excludes VATMar 2025€2,555,066207 m
12 Simmonscourt Rd, Ballsbridge, Dublin 4Aug 2025€1,200,000220 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 January 2024
  2. Decision due13 March 2024
  3. Decision issued6 March 2024
  4. Permission expiry24 May 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.