Planning Permission Ireland
GrantedExtensionDecided 23 May 2023

162 Littlepace Woods, Clonee, Dublin 15, D15 F3A3

Demolition of a rear extension for a new two-storey extension and attic conversion in Clonee.

FW23A/0086 · Fingal County Council · Lodged 5 April 2023

Reference
FW23A/0086
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
5 April 2023

Summary

AI-generated

The project involves demolishing an existing ground-floor rear extension to build a new ground and first-floor rear extension. It also includes converting the attic space, raising the gable wall, and adding a rear dormer.

Extensionextensiondemolitionattic conversiondormer
Floor area
198 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of demolition of existing ground floor rear extension. The construction of a ground and first floor extension to the rear with associated fenestrations. Reconfiguration of ground & first floor layouts comprising of new living room to the rear at ground floor. New stairs bedroom & bathroom on first floor. The conversion of existing attic space comprising of modifications of existing roof structure raising of existing gable c/w fenestration, 2 no. Roof lights to the front & flat roof dormer to the rear. With a gross internal floor area of 198.2 m2 and all associated site works.

Land-use zoning

What this land is zoned for

RS - ResidentialRS
Provide for residential development and protect and improve residential amenity

National zoning type: Existing residential

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 8 April 2024.

Notified floor area: 39

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
175 Littlepace Woods, Clonee, Dublin 15May 2025€601,00041 m
168 Littlepace Walk, Littlepace, CloneeApr 2026€370,00057 m
92 Littlepace Woods, Clonee, Dublin 15Jan 2025€504,00089 m
252 Littlepace Court, Clonee, DublinSept 2025€595,000128 m
96 Hazelbury Green, Clonee, Dublin 15Jan 2026€480,000132 m
244 Littlepace Court, Clonee, Dublin 15Jun 2025€655,000137 m
135 Hazelbury Park, Clonee, Dublin 15Jul 2025€573,000147 m
110 Hazelbury Green, Clonee, Dublin 15Jun 2025€480,000167 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received5 April 2023
  2. Decision due30 May 2023
  3. Decision issued23 May 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.