Planning Permission Ireland
GrantedCommercialDecided 20 January 2020

Energia Park, Donnybrook, Dublin, 4

Erection of three illuminated 'Energia Park' stadium branding signs at the Donnybrook stadium.

3162/19 · Dublin City Council · Lodged 4 June 2019

Reference
3162/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
4 June 2019

Summary

AI-generated

The development consists of installing three internally illuminated, aluminium fret-cut stadium branding signs. One sign will face Donnybrook Road over the eastern turnstiles, and two larger signs will be installed on the north-western and south-eastern gables of the Donnybrook Road Stand.

Commercialsignagestadiumbranding

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of the erection of 3 no internally illuminated, aluminium fret cut facia "energia park" stadium branding signs comprising: 1 no. Stadium branding sign (6m length x 1.2m height) fronting onto donnybrook road elevation, affixed to the existing steel frame over the eastern turnstile entrance, adjacent to the old wesley rugby football club pavillion; 1 no. Gable-end sign (6m length x 3.4m height) to be installed on the north-western gable end of the donnybrook road stand and 1 no. Gable-end sign (6m length x 3.4m height) to be installed on the south-eastern gable end of the donnybrook road stand, within the stadium ground.

Land-use zoning

What this land is zoned for

Z9: Amenity/Open Space Lands/Green NetworkOS
To preserve, provide and improve recreational amenity, open space and ecosystem services.

National zoning type: Mixed/general 'green'/recreation/conservation, other

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
111 Anglesea Rd, Donnybrook, Dublin 4Nov 2025€2,275,000146 m
109 Anglesea Rd, Ballsbridge, Dublin 4Nov 2025€2,450,000148 m
Apt 1, 129 Anglesea Road, DonnybrookJun 2025€1,190,000148 m
Apt 1, 131 Anglesea Road, DonnybrookApr 2026€1,300,000151 m
7 The Sycamore, Hazeldene, Anglesea RoadJul 2025€1,025,000207 m
12 Brookfield, Anglesea Road, BallsbridgeMar 2026€565,000218 m
85 Pembroke Cottages, Donnybrook, Dublin 4Jun 2025€690,000220 m
4 Laurel Hazeldean, Anglesea Road, Dublin 4Dec 2025€885,000227 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received4 June 2019
  2. Further information requested29 July 2019
  3. Further information received17 December 2019
  4. Decision due22 January 2020
  5. Decision issued20 January 2020
  6. Grant issued3 March 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.