Planning Permission Ireland
GrantedRetentionDecided 29 November 2018

Leinster Branch IRFU Rugby Grounds, Donnybrook Road, Donnybrook, Dublin 4

Retention of stadium branding signage at Energia Park facing Donnybrook Road.

4094/18 · Dublin City Council · Lodged 5 October 2018

Reference
4094/18
Authority
Dublin City Council
Register status
Decided
Type
Retention Permission
Received
5 October 2018

Summary

AI-generated

The Leinster Branch IRFU is seeking retention permission for stadium branding signage at Energia Park. This includes two printed vinyl signs applied inside existing glazing on the south-western elevation and one internally illuminated aluminium fascia sign over the Bective Pavilion entrance.

Retentionsignagestadiumcommercial

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Retention: leinster branch irfu intends to apply for retention planning permission for development on this site at energia park (leinster branch irfu rugby grounds also known as donnybrook stadium), donnybrook road, dublin
  • Retention permission is sought for the erection of stadium branding signage fronting onto donnybrook road. The development consists of 2 no. Printed vinyl 'energia park' signs applied inside of existing glazing on the south-western elevation of the site and 1 no. (internally illuminated) aluminium fret cut facia 'energia' park sign installed to the existing steel frame over the bective pavilion entrance to the stadium, on the north-western elevation to donnybrook road. (the existing flag poles at this location do not form part of this application)

Land-use zoning

What this land is zoned for

Z9: Amenity/Open Space Lands/Green NetworkOS
To preserve, provide and improve recreational amenity, open space and ecosystem services.

National zoning type: Mixed/general 'green'/recreation/conservation, other

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
111 Anglesea Rd, Donnybrook, Dublin 4Nov 2025€2,275,000146 m
109 Anglesea Rd, Ballsbridge, Dublin 4Nov 2025€2,450,000148 m
Apt 1, 129 Anglesea Road, DonnybrookJun 2025€1,190,000148 m
Apt 1, 131 Anglesea Road, DonnybrookApr 2026€1,300,000151 m
7 The Sycamore, Hazeldene, Anglesea RoadJul 2025€1,025,000207 m
12 Brookfield, Anglesea Road, BallsbridgeMar 2026€565,000218 m
85 Pembroke Cottages, Donnybrook, Dublin 4Jun 2025€690,000220 m
4 Laurel Hazeldean, Anglesea Road, Dublin 4Dec 2025€885,000227 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received5 October 2018
  2. Decision due29 November 2018
  3. Decision issued29 November 2018
  4. Grant issued17 January 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.