Planning Permission Ireland
GrantedCommercialDecided 17 November 2020

Block 3, Harcourt Centre, the junction of Harcourt Street and Harcourt Road, Saint Peter's, Dublin 2

Replacement of existing signage and installation of a new totem sign at Harcourt Centre.

3167/20 · Dublin City Council · Lodged 7 August 2020

Reference
3167/20
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
7 August 2020

Summary

AI-generated

The development consists of replacing an existing backlit stainless steel sign at fourth-floor level with a new illuminated sign. It also includes installing a new free-standing, three-dimensional aluminium totem sign on the property.

Commercialsignageoffice

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for replacement of existing signage and new signage as follows
  • Replacement of existing backlit stainless steel sign at fourth floor level to harcourt street side elevation with new stainless steel and coloured perspex illumined sign 655mm high x 4080mm wide
  • Installation of new free-standing three dimensional aluminium finished totem sign between existing boundary wall and south elevation, 600mm wide x 600 mm deep x 5885mm high (note 4700mm height visible above boundary wall) with stainless steel and coloured perspex illuminated signs to three sides with letters 411mm high

Land-use zoning

What this land is zoned for

Z6: Employment/EnterpriseSI
To provide for the creation and protection of enterprise and facilitate opportunities for employment creation.

National zoning type: Industrial, enterprise, employment

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 11 March 2021.

Notified floor area: 0.36

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
25 Harcourt Hall, Charlotte Way, Dublin 2Apr 2025€470,000146 m
6 Harcourt Hall, Charlotte Way, Dublin 2Jan 2025€386,000146 m
602 Shelbourne Plaza, Ringsend Rd, Dublin 4Jun 2026€700,000158 m
76 Harcourt Green, Charlemont St, Dublin 2May 2026€725,000185 m
77 Harcourt Green, Charlemont St, Dublin 2Dec 2025€315,000185 m
9 Grantham Place, South Circular Rd, Dublin 8Dec 2025€600,000192 m
3 Grantham Place, Harrington St, Dublin 8Oct 2025€287,500194 m
Apt 106, Harcourt Green, Charlemont StFeb 2025€327,150194 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 August 2020
  2. Further information requested1 October 2020
  3. Further information received21 October 2020
  4. Decision due17 November 2020
  5. Decision issued17 November 2020
  6. Grant issued6 January 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.