Planning Permission Ireland
GrantedChange of useDecided 5 July 2024

2 Central Plaza, Dame Street, Dublin 2

Change of use of basement, ground, and mezzanine levels from retail to leisure and tourism.

3183/24 · Dublin City Council · Lodged 12 February 2024

Reference
3183/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
12 February 2024

Summary

AI-generated

The application seeks permission to change the use of 2 Central Plaza at basement, ground, and mezzanine levels from retail to leisure/tourism use. The site is located adjacent to and within the vicinity of several Protected Structures.

Change of useprotected structuretourismcity centre

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: the building is bound to the north by the annex building (a protected structure, ref: 8830), to the east by 9 college green (a protected structure, ref: 1989), to the south by dame street, and to the west by central plaza (a protected structure, ref: 8830). The proposed development relates to permission for the change of use of 2 central plaza at basement, ground floor and mezzanine levels only, from permitted retail use (as permitted under dcc ref. 3154/17) to leisure/tourism use, and associated internal reconfiguration works.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 2 September 2024. A completion certificate was lodged on 20 December 2024.

Notified floor area: 760

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 1, 3 4 Cope St, Dublin 2Oct 2025€2,250,00058 m
3 Fownes St, Temple Bar, Dublin 2May 2026€1,600,00069 m
Top Floor Apt., 5a Fownes Street Upper, Temple BarOct 2025€250,00077 m
Apt 24 Sprangers Yard, Crowe St, DublinSept 2025€340,00087 m
Apartment 5, 50-52 Dame Street, Dublin 2Nov 2025€395,00097 m
The Friary, Cecilia St, Temple Bar Dublin 2Dec 2025€266,666106 m
Apt 6 Temple Bar Sq, Dublin 2, DublinDec 2025€330,000111 m
Apt 7, Temple Bar Sq, Dublin 2Jun 2026€465,000111 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received12 February 2024
  2. Decision due5 July 2024
  3. Decision issued5 July 2024
  4. Permission expiry26 September 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.