Planning Permission Ireland
InvalidAlterationsDecided 27 July 2021

54, Nephin Road, Cabra, Dublin 7, D07 PKF1

Modifications to a previously approved scheme to create three 3-storey, 4-bedroom houses.

3190/21 · Dublin City Council · Lodged 20 July 2021

Reference
3190/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
20 July 2021

Summary

AI-generated

The applicant seeks to modify a previously granted planning permission. The changes involve converting the approved layout of two 2-storey houses and one 3-storey house into three 3-storey, 4-bedroom dwellings, including ground and first-floor extensions and front dormer windows.

Alterationsmodificationsdormerextension
Residential units
3
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for modifications to the previously as granted planning application with the planning ref no. Abp-306055-19 & 3313/19. The modifications will consist of a change from the as-granted 2 no. Two storey 3-bedroom dwellings and one three storey 4-bedroom dwelling to 3 no. Three storey 4-bedroom dwellings. This will include a 10.7m2 total extension on the ground floor and a 15.3m2 total extension of the first floor and the addition of 2 no. Dormer windows at converted attic level to the front elevation with a total area of 13m². All works to be carried out to dwellings a1, a2 & b1, at no. 54 nephin road, cabra, dublin 7, eircode d07 pkf1, on the corner of nephin road and croaghpatrick road.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 12 December 2021. A completion certificate was lodged on 28 September 2022.

Notified floor area: 462.5

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
40 Croagh Patrick Rd, Navan Rd, Dublin 7Sept 2025€620,00063 m
9 Parkside View, Nephin Rd, Dublin 7Oct 2025€395,50069 m
7 Parkside View, Nephin Road, Dublin 7Mar 2026€387,00074 m
32 Ardpatrick Rd, Navan Rd, DublinApr 2025€720,00084 m
34 Ardpatrick Rd, Navan Rd, Dublin 7Mar 2025€776,00088 m
23 Ardpatrick Rd, Navan Rd, Dublin 7Jun 2025€750,000124 m
48 Ardpatrick Rd, Navan Rd, Dublin 7Sept 2025€648,000135 m
5 Roosevelt Cottages, Navan Rd, Dublin 7May 2026€610,000137 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 July 2021
  2. Decision due13 September 2021
  3. Decision issued27 July 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.