Planning Permission Ireland
InvalidCommercialDecided 10 February 2022

Temple Bar Inn, 40-47 Fleet Street, Dublin 2, D02 NX25

Construction of a new electrical substation and switch room with associated hotel alterations.

3220/22 · Dublin City Council · Lodged 7 February 2022

Reference
3220/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
7 February 2022

Summary

AI-generated

The project involves constructing a new electrical substation and switch room at the rear of the site, relocating the existing basement substation, and changing the use of the old substation area to hotel use. It also includes a new entrance door, glazed screen, and internal stairs.

Commercialhotelsubstationinfrastructure
Floor area
43 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission for the development will consist of the construction of a new electrical substation and switch room to the rear of the site, relocation of the existing electrical sub station and switch room (43 m2) from existing basement level to the new location at the rear of the site, a change of use of the existing substation area to hotel use, provision of a new entrance door and glazed screen , provision of a new internal stairs to basement level directly from fleet street, repositioning of existing signage and all associated site works.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 2 Aston Buildings, Aston Quay, Dublin 2May 2025€390,00097 m
Apt 3, 10 Aston Abbey, 10 Aston KeyJan 2025€290,000100 m
Apt 9, Aston Court, Bedford Row Dublin 2Jun 2026€415,000117 m
5 Aston Court, Bedford Row, Dublin 2Oct 2025€950,000117 m
Apt 10 Aston Court, Bedford Row, Temple BarMay 2025€397,000117 m
Apt 1 Aston Court, Bedford Row, Dublin 2Apr 2025€421,000117 m
Apt 4 Aston Court, Bedford Row, Temple BarJun 2026€412,000117 m
Apt 3 Lafayette Building, 1 5 Dolier St, DublinOct 2025€400,000147 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 February 2022
  2. Decision due1 April 2022
  3. Decision issued10 February 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.