Planning Permission Ireland
RefusedApartmentsDecided 7 August 2018

56, Faussagh Avenue, Cabra East, Dublin 7

Construction of a two-storey detached building containing two apartments to the rear of an existing house.

3248/18 · Dublin City Council · Lodged 13 June 2018

Reference
3248/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
13 June 2018

Summary

AI-generated

The development in Cabra East comprises two two-bedroom apartments, with one on the ground floor and one on the first floor. It includes balconies, private open space at roof level with timber screening, two car parking spaces, and bicycle storage.

Apartmentsapartmentsinfill
Residential units
2
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission is sought for construction of a two-storey detached building to the rear of 56 faussagh avenue, cabra east, dublin 7, comprising 2 no. Two-bedroom apartments ( 1 no. On the ground-floor and 1 no. On the first-floor), provision of a 2.91sq. M balcony on the east elevation serving bedroom 1 in each apartment, provision of private open space for each apartment (37.08sq. M to serve 1 no. Apartment and 37.81sq. M to serve the other apartment) at roof level with a timber clad screen, provision of 2 no. Car parking spaces, provision of 2 no. Bicycle parking spaces in bicycle store and all ancillary works necessary to facilitate the development.

Land-use zoning

What this land is zoned for

Z3: Neighbourhood CentresDC
To provide for and improve neighbourhood facilities.

National zoning type: District, neighbourhood centre

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
105 Dunmanus Rd, Cabra, Dublin 7May 2026€190,00044 m
95 Faussagh Ave, Cabra West, Dublin 7Apr 2026€355,00052 m
138 Dingle Road, Cabra, Dublin 7Sept 2025€420,00063 m
43 Liscannor Rd, Cabra West, Dublin 7Sept 2025€558,54598 m
83 Dunmanus Rd, Cabra West, Dublin 7Jun 2025€483,773108 m
106 Killala Road, Cabra West, Dublin 7Mar 2026€479,000133 m
104 Dingle Road, Cabra West, Dublin 7Jun 2025€395,000149 m
133 Dingle Road, Cabra West, Dublin 7Feb 2026€375,000153 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received13 June 2018
  2. Decision due7 August 2018
  3. Decision issued7 August 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.