Demolition of a former pub in Cabra and construction of a four-storey building with a supermarket and 18 apartments.
WEB2447/24 · Dublin City Council · Lodged 7 November 2024
- Reference
- WEB2447/24
- Authority
- Dublin City Council
- Register status
- Appealed
- Type
- Permission
- Received
- 7 November 2024
Summary
AI-generatedThe development proposes the demolition of the former 'Cabra House' public house (950 sq m) and the construction of a new four-storey building. The new building will feature a 475 sq m licensed supermarket on the ground floor and 18 apartments on the upper floors, along with communal open space, parking, and associated site works.
- Residential units
- 18
- Storeys
- 4
- Floor area
- 2,082 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Planning permission for development at a c. 0.16 ha site located at nos. 62-66 faussagh avenue, dublin 7, d07 kh60, (formerly ‘the cabra house’) and the adjoining unnamed laneway to the rear and to the west, extending to faussagh avenue. The development will principally consist of: the demolition of the part-one, part-two storey detached former licenced public house (950 sq m); the construction of a four-storey building (total gross floor area of 2,082sq m); (comprising a licensed supermarket of 475 sq m at ground floor; with 18 no. Apartments (13 no. 1-bed units and 5 no. 2-bed units, with balconies or terraces on the north and south elevations). The development will also consist of: private communal open landscaped space at first floor level podium over the extended ground floor retail area (320 sq m); circulation spaces; esb substation and switch room; plant room; waste storage areas; bicycle, cargo bike and motorbike parking; 6 no. Resident car parking spaces at the rear accessed via the laneway; sustainable urban drainage systems (including attenuation tank and green roof); boundary treatments, including the provision of a replacement rear gate; associated hard and soft landscaping; all other associated site excavation; infrastructural and site development works above and below ground including changes in level, and associated site servicing (foul and surface water drainage and water supply). The development will also consist of: alterations to the layout of the unnamed laneway to the rear and west including the removal of the existing gate at the entrance; revision to surface layout and road markings. Access to the scheme will be via faussagh avenue and the unnamed laneway to the rear.
Land-use zoning
What this land is zoned for
“To provide for and improve neighbourhood facilities.”
National zoning type: District, neighbourhood centre
Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 43 Liscannor Rd, Cabra West, Dublin 7 | Sept 2025 | €558,545 | 58 m |
| 138 Dingle Road, Cabra, Dublin 7 | Sept 2025 | €420,000 | 63 m |
| 95 Faussagh Ave, Cabra West, Dublin 7 | Apr 2026 | €355,000 | 75 m |
| 106 Killala Road, Cabra West, Dublin 7 | Mar 2026 | €479,000 | 93 m |
| 105 Dunmanus Rd, Cabra, Dublin 7 | May 2026 | €190,000 | 93 m |
| 83 Dunmanus Rd, Cabra West, Dublin 7 | Jun 2025 | €483,773 | 141 m |
| 93 Kilala Rd, Cabra West, Dublin 7 | Oct 2025 | €425,000 | 149 m |
| 1 Broombridge Rd, Dublin 7, Dublin | Feb 2026 | €467,000 | 152 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received7 November 2024
- Decision due8 August 2025
- Decision issued8 August 2025
- Appeal submitted1 September 2025
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- RefusedAt this site
Permission for development for a residential and retail development at ac. 0.16 ha site located at Nos. 62-66…
62-66 Faussagh Avenue, Dublin 7, DO7 KH60
3455/22Dublin CityLodged 7 Mar 2022Apartments
- Refused50 m away
Planning permission comprising the construction of two-storey detached building comprising 2 no. two-bedroom…
56, Faussagh Avenue, Cabra East, Dublin 7
3943/19Dublin CityLodged 6 Sept 2019Apartments
- Refused50 m away
Planning permission is sought for construction of a two-storey detached building to the rear of 56 Faussagh…
56, Faussagh Avenue, Cabra East, Dublin 7
3248/18Dublin CityLodged 13 Jun 2018Apartments
- Refused60 m away
Planning permission for a) the removal of existing garden wall to side of house no. 138,b) the construction…
138, Dingle Road, Cabra West, Dublin 7 D07 RD62
WEB1666/22Dublin CityLodged 20 Jul 2022New dwelling
- Invalid60 m away
Planning permission for a) the removal of existing garden wall to side of house no. 138,b) the construction…
138, Dingle Road, Cabra West, Dublin 7
WEB1658/22Dublin CityLodged 19 Jul 2022New dwelling
- Invalid60 m away
Planning Permission for a) the removal of existing garden wall to side of house no. 138, b) the construction…
138, Dingle Road, Cabra West, Dublin 7 D07 RD62
WEB1650/22Dublin CityLodged 15 Jul 2022New dwelling
- Invalid80 m away
Planning permission for alterations to existing hip roof to create gable roof to side to accommodate attic…
36, Liscannor Road, Dublin 7 D07 C3H9
WEB1801/23Dublin CityLodged 21 Sept 2023Extension
- Granted80 m away
Planning permission for Alterations to existing hip roof to create gable roof to side to accommodate attic…
36, Liscannor Road, Dublin 7, D07 C3H9
WEB1815/23Dublin CityLodged 26 Sept 2023Extension
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- RefusedApartments
Permission for development for a residential and retail development at ac. 0.16 ha site located at Nos. 62-66…
62-66 Faussagh Avenue, Dublin 7, DO7 KH60
3455/22Dublin CityLodged 7 Mar 2022
- RefusedApartments
Planning permission is sought for construction of a two-storey detached building to the rear of 56 Faussagh…
56, Faussagh Avenue, Cabra East, Dublin 7
3248/18Dublin CityLodged 13 Jun 2018
- InvalidApartments
The development will consist of the demolition of existing two storey commercial building fronting Quarry…
52 & 54 Quarry Road Cabra, Dublin 7
3783/24Dublin CityLodged 29 May 2024
- GrantedApartments
R & D Developments Limited (in Receivership), Grant Thornton intends to apply for planning permission for…
Former 'Matt’s of Cabra' Public House, 2A Fassaugh Avenue, Dublin 7, D07 TH77
WEBLRD6094/26-S3Dublin CityLodged 5 Jan 2026
- RefusedApartments
The development will consist of : (i) demolition of the existing two storey over basement building (licensed…
Kestrel House, 157 Walkinstown Road, Dublin 12, D12 NN8A
4280/23Dublin CityLodged 9 Aug 2023
- RefusedCommercial
Permission for development to demolish an ESB Substation (22 sq.m) and construct a Mixed-Use Building…
Site located between: R620 Douglas Relief Road and , Douglas , Cork
2140296Cork CityLodged 21 Jun 2021
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.