Planning Permission Ireland
GrantedAlterationsDecided 13 August 2018

16, Eustace Street, Temple Bar, Dublin 2

Fire safety upgrades and minor internal and external alterations to a five-storey protected building.

3297/18 · Dublin City Council · Lodged 19 June 2018

Reference
3297/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
19 June 2018

Summary

AI-generated

The development consists of fire safety upgrade works across all five floors of the building, including the construction of fire-rated lobbies. It also includes replacing modern doors, installing a new timber entrance door and fanlight, replacing a rooflight, and upgrading fire alarms.

Alterationsprotected structurefire safetyrefurbishment
Storeys
5

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: the development will consist of: fire upgrade works to all five floors of the building, the construction of fire rated lobbies to ground, first and second floors, the replacement of modern doors at basement level, the replacement of modern glass entrance door with new painted timber door and fanlight, the replacement of existing fixed rooflight to rear of building, the construction of new attic hatches at third floor, upgrade of fire alarm and emergency lighting along with all other associated building works.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 19 June 2020.

Notified floor area: 397

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
8 Printworks, Essex St, Dublin 2Feb 2025€290,00022 m
Apartment 4, 5-6 Temple Lane South, Temple BarNov 2025€355,00052 m
Apartment 5, 5-6 Temple Lane South, Temple BarNov 2025€355,00052 m
Apartment 7, 3 Temple Bar, Dublin 2May 2026€242,00058 m
The Friary, Cecilia St, Temple Bar Dublin 2Dec 2025€266,66671 m
2 34 35 Wellington St, Dublin 2, DublinJan 2025€380,00080 m
Apt 24 Sprangers Yard, Crowe St, DublinSept 2025€340,00081 m
Top Floor Apt., 5a Fownes Street Upper, Temple BarOct 2025€250,00089 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 June 2018
  2. Decision due13 August 2018
  3. Decision issued13 August 2018
  4. Grant issued18 September 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.