Planning Permission Ireland
GrantedChange of useDecided 19 February 2021

17, Montague Street, Dublin 2

Change of use from vacant office to cafe, including a rear extension and facade alterations.

3315/20 · Dublin City Council · Lodged 4 September 2020

Reference
3315/20
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
4 September 2020

Summary

AI-generated

The development consists of changing the use of a vacant office to a cafe with ancillary staff and kitchen areas. It includes front facade alterations for a service hatch and a rear extension into the courtyard of a neighboring Protected Structure.

Change of usecafeoffice to cafeprotected structure
Floor area
11 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development consists of a change of use from vacant office use to cafe use, with ancillary staff areas, office space and kitchen at first floor, with removal works to the existing front facade to provide service hatch to montague street and general upgrading of the existing facade, internal removal works to allow for cafe use, together with removal and replacement of the rear external wall to allow for an extension and increased floor area of circa 10.5 sqm, the extension is proposed into the rear courtyard associated with the curtilage of no. 16 harcourt street, dublin 2 (a protected structure, dublin city council rps no. 3525). All with associated signage, drainage and site works.

Land-use zoning

What this land is zoned for

Z8: Georgian Conservation Areas
To protect the existing architectural and civic design character, and to allow only for limited expansion consistent with the conservation objective.

National zoning type: General

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 1 May 2024.

Notified floor area: 66

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
8 Camden Buildings, Dublin 2Mar 2026€575,000142 m
38 Wexford St, Apt 1, Dublin 2Feb 2025€800,000164 m
Apt 12 Russell Court, 95/96 St Stephens Green, Dublin 2Jul 2025€615,000174 m
37 Harcourt Street, Dublin 2Nov 2025€2,600,000175 m
8 Olympic House, Pleasants Street, Dublin 8May 2026€700,000201 m
2 Camden Court, Camden Street Lower, Dublin 2Jun 2026€525,000202 m
12 Cuffe Lane, Cuffe St, Dublin 2Aug 2025€460,000214 m
7 The Courtyard, Pleasants St, Dublin 8May 2025€585,000215 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received4 September 2020
  2. Further information requested29 October 2020
  3. Further information received25 January 2021
  4. Decision due19 February 2021
  5. Decision issued19 February 2021
  6. Grant issued6 April 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.