Planning Permission Ireland
GrantedInfrastructureDecided 14 August 2018

Number one Ballsbridge on the former Veterinary College site Shelbourne Road, Shelbourne Lane and 126, Pembroke Road, Ballsbridge, Dublin 4

Installation of a rooftop telecommunications base station concealed by replica flues and screening.

3319/18 · Dublin City Council · Lodged 20 June 2018

Reference
3319/18
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
20 June 2018

Summary

AI-generated

The project involves installing a multi-user shrouded telecommunications base station on the rooftop of Blocks 1 and 3. The antennas, dishes, and equipment will be concealed by replica flues and louvre screening, with cabling routed to an existing ground floor communications room.

Infrastructuretelecomsrooftopinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Install a multi-user shrouded telecommunications base station on the rooftop of block 1 & 3 which comprises replica flues and louvre screening concealing antennas, dishes, power cabinets, rru equipment and supporting apparatus, cabled through existing risers to telecommunications exchange cabinets within an existing comms room to the ground floor with access over existing routes .

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
2 The Barrington, Lansdowne Place, Ballsbridgeprice excludes VATOct 2025€1,541,850124 m
8 The Barrington, Lansdowne Place, BallsbridgeMay 2026€1,180,000124 m
10 The Barrington, Lansdowne Place, Lansdowne RoadApr 2025€1,592,450124 m
13 The Barrington, Lansdowne Place, BallsbridgeFeb 2025€1,500,000124 m
5 The Barrington, Lansdowne Place, Ballsbridgeprice excludes VATAug 2025€1,541,850141 m
48 The Barrington, Ballsbridge, Lansdowne PlaceApr 2026€865,000141 m
4 The Barrrington, Lansdowne Place, BallsbridgeMay 2026€2,375,000141 m
26 The Hutchins, Lansdowne Place, BallsbridgeJan 2026€1,860,000149 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 June 2018
  2. Decision due14 August 2018
  3. Decision issued14 August 2018
  4. Grant issued19 December 2018
  5. Appeal submitted5 September 2018
  6. Appeal decided10 December 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.