Planning Permission Ireland
GrantedChange of useDecided 22 January 2019

Unit 3, Ballsbridge One, New Pembroke Street, Shelbourne Road, Dublin 4

Change of use from retail to a licensed restaurant with a new mezzanine kitchen in Ballsbridge.

4425/18 · Dublin City Council · Lodged 19 November 2018

Reference
4425/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
19 November 2018

Summary

AI-generated

The application seeks a change of use for a 170 sq.m ground floor unit from retail to a licensed restaurant with an ancillary take-out area. The development also includes constructing a new 65 sq.m mezzanine level for use as a kitchen and ancillary services, bringing the total floor area to 235 sq.m.

Change of userestaurantchange of usemezzanine
Floor area
235 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Planning permission is sought for the change of use of unit 3 in the new pembroke street in the ballsbridge one development bounded by pembroke street and shelbourne road, ballsbridge, dublin
  • The development involves a change of use at ground floor level (170 sq. M in floor area) from approved retail use (reg. Ref. 4798/07) to use as a licences restaurant with an ancillary take out area. The development also includes the construction of a mezzanine (for use as a kitchen and ancillary services) 65 sq. M in area within the premises. The total floor area of completed development would be 235 sq. M

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 18 November 2019.

Notified floor area: 235

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
10 The Barrington, Lansdowne Place, Lansdowne RoadApr 2025€1,592,450131 m
2 The Barrington, Lansdowne Place, Ballsbridgeprice excludes VATOct 2025€1,541,850131 m
8 The Barrington, Lansdowne Place, BallsbridgeMay 2026€1,180,000131 m
13 The Barrington, Lansdowne Place, BallsbridgeFeb 2025€1,500,000131 m
5 The Barrington, Lansdowne Place, Ballsbridgeprice excludes VATAug 2025€1,541,850145 m
48 The Barrington, Ballsbridge, Lansdowne PlaceApr 2026€865,000145 m
4 The Barrrington, Lansdowne Place, BallsbridgeMay 2026€2,375,000145 m
26 The Hutchins, Lansdowne Place, BallsbridgeJan 2026€1,860,000150 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 November 2018
  2. Decision due22 January 2019
  3. Decision issued22 January 2019
  4. Grant issued26 February 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.