Planning Permission Ireland
GrantedAlterationsDecided 29 August 2018

72, 74, 76, Morehampton Road, Dublin 4

Facade repointing, demolition of a changing room, and landscaping works at three interconnected protected structures.

3437/18 · Dublin City Council · Lodged 5 July 2018

Reference
3437/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
5 July 2018

Summary

AI-generated

The proposed works target three interconnected protected structures on Morehampton Road. Works include repointing the front facades, demolishing a freestanding single-storey changing room block to replace it with a new pavilion, and restoring boundary walls.

Alterationsprotected structuredemolitionrestoration

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: planning permission is sought by efekta morehampton ltd. For works to three interconnected buildings at 72/74/76 morehampton road, donnybrook, dublin 4, all protected structures. The proposed works include, the re-pointing of the front facades of nos. 72, 74 and 76, the demolition of a freestanding, single-storey changing room block to the rear of no. 76 and its replacement with a single-storey pavilion in the same location, the restoration of the boundary wall between no. 76 and 78 and landscaping works including the removal of high level fencing and overhead netting to the rear of no. 72 and the provision of external lighting to nos. 72, 74 & 76.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 25 October 2018. A completion certificate was lodged on 25 January 2019.

Notified floor area: 55

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
60 Morehampton Rd, Donnybrook, Dublin 4not full market priceSept 2025€230,77760 m
2 Park Mews, Morehampton Lane, DonnybrookApr 2025€560,00074 m
4 Herbert Park, Donnybrook, Dublin 4Jul 2025€2,526,54476 m
52 Morehampton Rd, Donnybrook, Dublin 4Aug 2025€1,226,00091 m
10 Morehampton Lane, Donnybrook, Dublin 4Nov 2025€1,505,00091 m
6 Marlborough Rd, Donnybrook, Dublin 4Mar 2026€1,185,000114 m
2 Morehampton Terrace, Donnybrook, Dublin 4Jan 2025€1,300,000115 m
18 Herbert Park, Ballsbridge, Dublin 4May 2025€4,250,000115 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received5 July 2018
  2. Decision due29 August 2018
  3. Decision issued29 August 2018
  4. Grant issued3 October 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.