AIB Bank Centre, Ballsbridge, Dublin 4
Landscaping and security upgrades at the former AIB Bank Centre in Ballsbridge.
3482/21 · Dublin City Council · Lodged 9 September 2021
- Reference
- 3482/21
- Authority
- Dublin City Council
- Register status
- Decided
- Type
- Permission
- Received
- 9 September 2021
Summary
AI-generatedThe proposed works at Blocks E, G, H, and F include hard and soft landscaping, new seating, planters, external lighting, and an exercise area. Security and access upgrades are also planned, including new vehicle barriers, a 2.4m timber fence, and revised gate arrangements.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Turner & townsend ltd. Intends to apply for planning permission for development at this site at the former aib bank centre, serpentine avenue, ballsbridge, dublin
- The application site comprises blocks e, g, h and f and surrounding landscaped areas. The proposed development comprises hard and soft landscaping works including the provision of seating, bollards, additional planters, external lighting, paving works and an exercise area (resulting in an amendment of dcc reg. Ref. 3500/20). Additional proposals include revisions to the existing secure barrier and footpath arrangement adjacent to the south eastern entrance along serpentine avenue; additional vehicle and safety barriers within the site; the erection of a 2.4m timber fence set back within the site from the existing boundary onto serpentine avenue; a revised gate arrangement at the block j entrance onto serpentine avenue; a roof light on an existing pop-up planter feature to the north of block f; cladding to existing pop-up enclosures; the installation of a sun-screen within the existing atrium area located to the front of block g; and all associated site development works above and below ground
Land-use zoning
What this land is zoned for
“To provide for the creation and protection of enterprise and facilitate opportunities for employment creation.”
National zoning type: Industrial, enterprise, employment
Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 30 May 2022. A completion certificate was lodged on 31 January 2023.
Notified floor area: 56,290 m²
10 commencement notices are linked to this development.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 21 Serpentine Ave, Ballsbridge, Dublin 4 | Nov 2025 | €1,500,000 | 106 m |
| Apt 15, Wellington Lodge, Serpentine Ave Dublin 4 | Feb 2026 | €373,500 | 127 m |
| 19 Wellington Lodge, Serpentine Ave, Ballsbridge | Apr 2026 | €417,000 | 127 m |
| 10 El Greco, St James Court, Serpentine Ave Dublin 4 | Aug 2025 | €430,000 | 162 m |
| Apt 4 El Greco, Saint James Court, Serpentine Avenue | Apr 2026 | €406,000 | 162 m |
| 2 Sydenham Road, Ballsbridge, Dublin 4 | Mar 2026 | €1,950,000 | 173 m |
| 3 Sydenham Court, Sydenham Road, Dublin 4 | Mar 2025 | €631,000 | 186 m |
| 4 Sydenham Court, Sydenham Rd, Dublin 4 | Jan 2026 | €710,000 | 186 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received9 September 2021
- Decision due3 November 2021
- Decision issued3 November 2021
- Grant issued15 December 2021
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Planning permission for the proposed development will consist of amendments to a previously permitted…
Former AIB Bank Centre (comprising Blocks E, F, G & H) at the junction of Merrion Road and Serpentine Avenue, Ballsbridge, Dublin 4.
3500/20Dublin CityLodged 5 Oct 2020Alterations
- GrantedAt this site
The proposed development will consist of amendments to a previously permitted development under DCC Reg. Ref.…
Site known as the former AIB Bank Centre (comprising Blocks E, F, G & H), at the Junction of Merrion Road and Serpentine Avenue, Ballsbridge, Dublin 4
3806/19Dublin CityLodged 16 Aug 2019Alterations
- GrantedAt this site
The proposed development includes internal and external alterations to the building. Internal alterations…
The former AIB Bank Centre (comprising Blocks E, F, G & H) at the junction of Merrion Road and Serpentine Avenue, Ballsbridge, Dublin 4
3626/18Dublin CityLodged 1 Aug 2018Commercial
- Not exempt — permission neededAt this site
EXPP: Provision of proposed new vehicular roller shutter at top of basement carpark along with proposed new…
Block 1, Fibonacci Square, Ballsbridge, Dublin 4
0142/26Dublin CityLodged 17 Apr 2026Commercial
- Granted70 m away
The proposed development comprises a c.2.4m high timber fence set back within the site from the existing…
The former AIB Bank Centre (comprising Blocks L, K, & J), Serpentine Avenue, Ballsbridge, Dublin 4
4169/19Dublin CityLodged 9 Oct 2019Commercial
- Granted80 m away
Turner & Townsend Ltd. intends to apply for planning permission for development at this site at the former…
The former AIB Bank Centre (comprising Blocks K & L), Serpentine Avenue, Ballsbridge, Dublin 4.
3311/21Dublin CityLodged 11 Aug 2021Energy
- Granted90 m away
The development will consist of the construction of a new glazed revolving door to the Block J glazed atrium…
AIB Bankcentre, Merrion Road, Ballsbridge, Dublin 4
3312/18Dublin CityLodged 20 Jun 2018Commercial
- Granted90 m away
The development will consist of change of use from existing bank branch to general office use. Removal of…
AIB Bankcentre, Merrion Road, Ballsbridge, Dublin 4
3311/18Dublin CityLodged 20 Jun 2018Change of use
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
Turner & Townsend Ltd. intends to apply for planning permission for development at this site at the former…
The former AIB Bank Centre (comprising Blocks K & L), Serpentine Avenue, Ballsbridge, Dublin 4.
3311/21Dublin CityLodged 11 Aug 2021
- GrantedChange of use
Planning Permission for amendments to the office development permitted under Reg. Ref. 2221/16 & ABP Ref.: PL…
Site of c. 1.56 ha located on the former AIB Bank Centre lands at the junction of Merrion Road and Serpentine Avenue, Ballsbridge, Dublin 4
2814/20Dublin CityLodged 5 Jun 2020
- GrantedCommercial
The development will consist of the construction of a new glazed revolving door to the Block J glazed atrium…
AIB Bankcentre, Merrion Road, Ballsbridge, Dublin 4
3312/18Dublin CityLodged 20 Jun 2018
- GrantedChange of use
The development will consist of change of use from existing bank branch to general office use. Removal of…
AIB Bankcentre, Merrion Road, Ballsbridge, Dublin 4
3311/18Dublin CityLodged 20 Jun 2018
- GrantedCommercial
10 year permission for development on a 1.38 Ha site at Nos. 1-3 Ballsbridge Park, Dublin — The development…
Nos. 1-3, Ballsbridge Park, Dublin 4
2220/19Dublin CityLodged 7 Feb 2019
- GrantedExtension
Planning Permission for the proposed demolition of the existing ground floor rear extension of the existing…
3, Serpentine Avenue, Ballsbridge, Dublin 4
WEB2066/22Dublin CityLodged 25 Nov 2022
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.