Planning Permission Ireland
GrantedInfrastructureDecided 5 June 2024

Mater Misericordiae University Hospital, Eccles Street, Dublin 7

Relocation of a link corridor and courtyard infill at the Mater Hospital.

3523/24 · Dublin City Council · Lodged 11 April 2024

Reference
3523/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
11 April 2024

Summary

AI-generated

Permission is sought for works at the Mater Hospital, including relocating and resizing a Level 02 link connection between the Whitty Building and a rooftop extension. It also includes infilling an external courtyard at Level 01 for mechanical and electrical plant use.

Infrastructurehospitalextensioninfrastructure
Floor area
88 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of the following: the relocation and resizing of the link connection at level 02 between the existing whitty building and the previously granted rooftop extension development, reg ref 3616/20 to accommodate support service and circulation for the department. In addition, the part infill of an existing external courtyard from garden space to internal accommodation at level 01 for the purposes of mechanical and electrical plant provision. The development is located directly over the north circular road main entrance to the north of the campus. This is within the centre of the mater hospital campus, eccles street, dublin 7 and will have a total additional internal area of 88sqm. The works form part of the ongoing enabling works for the development of the hospital's facilities.

Land-use zoning

What this land is zoned for

Z15: Community and Social InfrastructureCI
To protect and provide for community uses and social infrastructure.

National zoning type: Mixed/general community services/facilities uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 30 January 2024. A completion certificate was lodged on 20 May 2025.

Notified floor area: 1,774

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
7 Glengarriff Parade, North Circular Rd, Dublin 7Nov 2025€875,00071 m
11 Glengariff Parade, Glasnevin, Dublin 11Nov 2025€420,00079 m
13 Glengarriff Parade, Phibsborough, Dublin 7Feb 2026€475,00083 m
4 Killarney Parade, PhibsboroughDec 2025€450,00091 m
2 Muckross Parade, Circular Rd North, Dublin 7Jan 2025€270,00094 m
21 Glengarriff Parade, North Circular Rd, Dublin 7Oct 2025€540,000103 m
15 Derrynane Parade, North Circular Rd, Dublin 7Oct 2025€415,000108 m
2 St Joseph St, North Circular Rd, Dublin 7Feb 2026€670,000112 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received11 April 2024
  2. Decision due5 June 2024
  3. Decision issued5 June 2024
  4. Permission expiry2 September 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.