Planning Permission Ireland
GrantedChange of useDecided 7 December 2020

Unit 1/3, Camac House, Bow Bridge, Dublin 8

Change of use of a basement car park to bicycle/bin storage, and public house alterations.

3557/20 · Dublin City Council · Lodged 14 October 2020

Reference
3557/20
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
14 October 2020

Summary

AI-generated

Permission and retention are sought to change a basement car park into bicycle and bin storage, replacing a car lift with a service lift. The application also includes internal alterations to the existing public house and retention of altered entrance doors.

Change of usepubbasementbicycle parking

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission & retention: the proposed development will consist of the following
  • Change of use of the formerly intended basement car park to bicycle and bin storage area, providing basement level lobbies with retention of removal of car lift and replacement with goods/ service lift
  • Internal alterations, increasing the size of kitchen area, relocation of accessible w. C. , and provision of g. F. L store area and internal lobbies to the existing public house
  • Retention of alteration of entrance doors on the bow bridge elevation, from vehicle access doors to 1no. Double doors and 1no. Single door, internal alterations including all associated site and ancillary works

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 10 June 2022.

Notified floor area: 37.9

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
26 Bow Bridge House, Kilmainham, Dublin 8Sept 2025€365,00031 m
Apt No1 Bow Bridge House, Bow Lane West, Kilmainham Dublin 8Dec 2025€326,50031 m
4 Bow Bridge House, Bow Lane West, Kilmainham Dublin 8Jun 2025€331,00031 m
35 Cammock, Mount Brown, Kilmainham Dublin 8not full market priceFeb 2026€160,00054 m
Apt 13 Manor Hall, Mount Brown, Dublin 8Oct 2025€400,00063 m
7 Manor Hall, Mountbrown, James StMay 2026€387,00063 m
10 Bow Bridge, Kilmainham, Dublin 8Nov 2025€350,00064 m
20 Bowbridge Place, Irwin Street, KilmainhamMar 2025€390,00066 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received14 October 2020
  2. Decision due8 December 2020
  3. Decision issued7 December 2020
  4. Grant issued2 February 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.