Planning Permission Ireland
GrantedCommercialDecided 22 July 2019

Site at 133 & 133A Capel St. 136A & 136B Capel St.7 & 7A Meetinghouse Lane & 23 Little Mary St. Dublin 1 (Part known as Former Bolands Bakery, 133B Capel St.)

Development of a hotel across multiple properties on Capel Street, involving partial demolition of protected structures.

3572/18 · Dublin City Council · Lodged 25 July 2018

Reference
3572/18
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
25 July 2018

Summary

AI-generated

The project proposes a hotel development on a 0.212-hectare site involving several protected structures on Capel Street, Meetinghouse Lane, and Little Mary Street. Works include the removal of 2,614 square metres of existing floor space, mostly non-original fabric, and the change of use of retained structures from commercial to hotel use.

Commercialhotelprotected structuredemolition
Floor area
1,703 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure; the development of a hotel at a 0.212 ha site at nos. 133 and 133a capel street, nos. 136a and 136b capel street, nos. 7 and 7a meetinghouse lane and no. 23 little mary street, dublin 1 (all protected structures with the exception of nos. 7a meetinghouse lane , rps nos. 1213,5064, 8772). Part of the site is also known as the former boland's bakery (including structures to the rear opening onto meetinghouse lane) referred to as no. 133b capel street in the record of protected structures (also rps no. 1213)- the development will consist of: the removal of part of existing floor space (2,614 sq. M) which principally includes the removal of non-original fabric to protected structures of no architectural significance (including fabric such as flat roofed extensions, stud partitions, block work services enclosures, infill floor and ceiling sections, stair enclosures, atrium and lift shaft, block fabric to original openings) in addition to the limited removal of original fabric to facilitate permeability and connectivity (including the provision of openings in existing masonry; change of use of building fabric to be retained (1,703 sq. M) from current commercial use (offices, storage and workshop), ancillary car parking and residential use to use as a hotel; and the provision of an additional 4,154 sq. M to facilitate a development with a gross floor area of 5,857 sq. M (a total 1,540 sq. M larger than existing premises which has a gross floor area of 4,317 sq. M) the proposed development will range in height from part one to part eight storeys and the hotel will comprise 98 no. Bedrooms in addition to ancillary facilities including bar, restaurant and function areas. The development includes modifications to non-original shop fronts and conservation works to existing structures including roof repair to early buildings, masonry repointing , removal of cementitious render and replacement with lime-based render, masonry consolidation, repair/replacement of rainwater goods, repair / replacement of non-original window joinery, creation of new openings through existing masonry, structural and services intervention, architectural modifications and general internal and external works for the repair, maintenance and upgrading of the buildings . The development includes cycle parking spaces; hard and soft landscaping including courtyards and inaccessible upper level outdoor planted spaces; the provision of an enclosed upper level terrace with retractable roof lights; signage; lighting; plant; service and refuse areas; and all associated works above and below ground. The proposed development can be accessed via no. 133 capel street, no. 7 meetinghouse lane and no. 23 little mary street.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 9, 124 Capel St, Dublin 1Sept 2025€438,00065 m
Apt 7, 124 Capel Street, Dublin 1Oct 2025€450,00065 m
Apartment 6, 124 Capel Street, Dublin 1Oct 2025€430,00065 m
Apartment 16, 121/122 Capel Street, Dublin 1Mar 2025€221,00084 m
2 Mary Street, Dublin 1Jun 2025€450,00086 m
Apt 2 Chandler's Court, 49/50 Capel Street, Dublin 1Jan 2025€222,000122 m
12 Cayel Court, Cayel St Dublin 1, Dublin 1May 2025€279,000124 m
34 Capel Court, Capel St, Dublin IJan 2026€298,000124 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received25 July 2018
  2. Further information requested21 June 2019
  3. Further information received25 June 2019
  4. Decision due22 July 2019
  5. Decision issued22 July 2019
  6. Appeal submitted21 August 2019
  7. Appeal decided12 March 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.