Planning Permission Ireland
GrantedApartmentsDecided 12 June 2023

A site formaly known as The Drake Inn, 59/60 Main Street, Finglas, Dublin 11 (located at the junction of Main Street and Jamestown Road, and bounded by 61 Main Street to the west, 66 Main Street to the west, and 5 Jamestown Road to the north)

Demolition of a commercial building and construction of a seven-storey mixed-use building with 25 apartments and retail/pub space.

3594/23 · Dublin City Council · Lodged 19 April 2023

Reference
3594/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
19 April 2023

Summary

AI-generated

The proposed development involves the demolition of the existing commercial building at the former Drake Inn site. It will be replaced by a six-storey over basement mixed-use building containing a retail unit, a gastropub/restaurant, and 25 apartments with balconies and communal roof terraces.

Apartmentsdemolitionmixed useapartmentspub
Residential units
25
Storeys
7

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development will consist of the demolition of the existing two-storey over part basement (three storey), terraced, commercial building and the construction of a six-storey over full basement (seven storey) terraced mixed-use building consisting of 1 no. Retail unit and 1 no. Gastropub/restaurant at ground floor level, and a total of 25 no. Apartments over five floors (8 no. One beds, 11 no. Two beds and 6 no. Three beds) with balconies to the south, east and west elevations, and communal roof terraces, all over a basement comprising 74 no. Bicycle parking spaces, bin stores, plant room, and stores and ancillary service areas for the commercial unit, 10 no. Bicycle parking spaces at ground floor level for staff, and 6 no. External bicycle parking spaces for visitors (adjoining jamestown road), and all associated site and engineering works necessary to facilitate the development.

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
2 St Cancies Precinct, Main St, Finglas Village Dublin 11not full market priceFeb 2025€225,000130 m
20 The Lawn, Church Rd, Finglas East Dublin 11Feb 2025€475,000146 m
38 Jamestown Rd, Finglas, Dublin 11Apr 2026€430,000203 m
5 Georges Rd, Finglas, Dublin 11Apr 2025€400,000206 m
40 Jamestown Rd, Finglas East, Dublin 11Oct 2025€335,000211 m
15 St Canices Sq, Church St, Finglas Dublin 11Jan 2026€240,000226 m
9a St Canices Sq, Church St, Dublin 11Dec 2025€235,000226 m
16 North Rd, Finglas, Dublin 11Jun 2025€500,000229 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 April 2023
  2. Decision due13 June 2023
  3. Decision issued12 June 2023
  4. Permission expiry2 September 2028

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.