Planning Permission Ireland
GrantedAlterationsDecided 26 January 2022

13 St. Andrew Street, Dublin 2, D02 DP48

Alterations to the shopfront, office entrance, and minor floor area increases in a mid-terrace building.

3731/21 · Dublin City Council · Lodged 20 October 2021

Reference
3731/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
20 October 2021

Summary

AI-generated

The project involves alterations to the shopfront and office entrance of a mid-terrace building. It includes minor floor area increases for the office and retail spaces at ground floor level, a new office lobby, and parapet railings at the first floor.

Alterationsshopfrontofficeretail
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission for a mid-terrace building consisting of three storey office use over retail use at ground floor and basement. Development to consist of: alterations to shopfront and office entrance on st. Andrew street, increase in floor areas of office (2.5m2) and retail (0.5m2) at ground floor and formation of new office lobby plus adjustments to ground floor door opening on rear elevation, plus new flat roof access door and provision of parapet railings at first floor plus all associated works.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apartment 5, 50-52 Dame Street, Dublin 2Nov 2025€395,000158 m
3 Fownes St, Temple Bar, Dublin 2May 2026€1,600,000162 m
Apt 1, 3 4 Cope St, Dublin 2Oct 2025€2,250,000178 m
Top Floor Apt., 5a Fownes Street Upper, Temple BarOct 2025€250,000183 m
Apt 24 Sprangers Yard, Crowe St, DublinSept 2025€340,000184 m
Apartment 1, 17 Fade Street, Dublin 2Feb 2026€1,275,000189 m
Apt B, 116 Grafton Street, Dublin 2May 2026€660,000194 m
Apartment 4, 5-6 Temple Lane South, Temple BarNov 2025€355,000214 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 October 2021
  2. Further information requested14 December 2021
  3. Further information received21 December 2021
  4. Decision due26 January 2022
  5. Decision issued26 January 2022
  6. Grant issued11 March 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.