Planning Permission Ireland
GrantedAlterationsDecided 21 April 2023

13, St. Andrew Street, Dublin 2, D02 DP48

Alterations to a shopfront and basement lowering on St. Andrew Street.

3010/23 · Dublin City Council · Lodged 6 January 2023

Reference
3010/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
6 January 2023

Summary

AI-generated

The development consists of alterations to the shopfront to slightly increase the shopfloor area, lowering the basement floor by approximately 300mm to provide a minimum head height of 2.4 metres, installing new staircases, replacing a rooflight, and retrofitting insulation.

Alterationsretailshopfrontbasement

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Development to consist of: alterations to shopfront on st. Andrew street increasing the shopfloor area by (0.25m2) and constructed to details matching adjacent shopfront at no. 12 andrew street, plus lowering of basement floor by circa 300mm to provide min. Head height of 2.4 metres throughout plus provide new staircases, plus remove and adjust windows in rear elevation at ground floor level to accommodate relocated incoming gas and electrical meter-box locations , plus replace pyramidal rooflight to rear flat roof, plus retrofit insulation throughout, plus all associated works.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apartment 5, 50-52 Dame Street, Dublin 2Nov 2025€395,000157 m
3 Fownes St, Temple Bar, Dublin 2May 2026€1,600,000162 m
Apt 1, 3 4 Cope St, Dublin 2Oct 2025€2,250,000178 m
Top Floor Apt., 5a Fownes Street Upper, Temple BarOct 2025€250,000183 m
Apt 24 Sprangers Yard, Crowe St, DublinSept 2025€340,000183 m
Apartment 1, 17 Fade Street, Dublin 2Feb 2026€1,275,000189 m
Apt B, 116 Grafton Street, Dublin 2May 2026€660,000194 m
Apartment 4, 5-6 Temple Lane South, Temple BarNov 2025€355,000213 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received6 January 2023
  2. Decision due21 April 2023
  3. Decision issued21 April 2023
  4. Permission expiry16 July 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.