Planning Permission Ireland
GrantedApartmentsDecided 29 May 2020

Elmpark Green, Merrion Road, Dublin 4

Construction of a residential building ranging from 3 to 9 storeys containing 73 apartments with basement parking.

3743/19 · Dublin City Council · Lodged 13 August 2019

Reference
3743/19
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
13 August 2019
Floor area
125 m²

Summary

AI-generated

The development consists of a part 3 to part 9 storey residential building providing 73 apartments. It includes terraces, balconies, revisions to the basement layout to add 52 car parking spaces and 73 bicycle spaces, a playground, and associated landscaping.

Apartmentsapartmentsbasementplaygroundpv panels
Residential units
73
Storeys
9

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of: - part 3, part 4, part 5, part 7 and part 9 storey residential building providing for 73 no. Apartments (1 studio; 10 1-bed; 56 2-bed and 6 3-bed units) with terraces, balconies and winter gardens to south, east and west elevations; - the proposed residential development is located immediately south of the existing 'the links' building which is situated to the west of the overall campus; - revisions to basement layout resulting in the provision of an additional 52 no. Car parking spaces and 73 no. Bicycle parking spaces; bin storage and access cores to service the residential development; - provision of playground and associated landscaping to west of 'the links' building; - all associated works, site development, landscaping, utilities infrastructure, temporary construction works, plant and pv panels.

Land-use zoning

What this land is zoned for

Z6: Employment/EnterpriseSI
To provide for the creation and protection of enterprise and facilitate opportunities for employment creation.

National zoning type: Industrial, enterprise, employment

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 14 May 2019. A completion certificate was lodged on 24 September 2023.

Notified floor area: 71.5

5 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
50 Elm Park, Merrion Road, BallsbridgeMar 2026€410,00085 m
8 The Bay Elm Park, Merrion Road, BallsbridgeJul 2025€387,000106 m
Apt 154 The Links, Elm Park, Dublin 4Jul 2025€825,000136 m
Apt 132 - The Links, Elm Park, Merrion RoadMay 2025€850,000137 m
Apartment 131, The Links, Elm ParkJul 2025€862,000137 m
Apt 178 The Links, Elm Park, Dublin 4Mar 2026€820,000137 m
Apt 160, The Links, Elm ParkJun 2025€421,000137 m
Apt 189, The Links, Elm Park Dublin 4Sept 2025€455,000140 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received13 August 2019
  2. Further information requested7 October 2020
  3. Further information received8 April 2020
  4. Decision due19 June 2020
  5. Decision issued29 May 2020
  6. Grant issued9 October 2020
  7. Appeal submitted26 June 2020
  8. Appeal decided9 October 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.