Planning Permission Ireland
GrantedChange of useDecided 18 August 2022

Elmpark Green, Merrion Road, Dublin 4

Change of use of the first floor of a building from office to leisure use.

4312/22 · Dublin City Council · Lodged 24 June 2022

Reference
4312/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
24 June 2022

Summary

AI-generated

The development consists of changing the use of the first floor of the building from office space to leisure use. The building is located between two apartment blocks within Elmpark Green.

Change of useofficeleisurechange of use

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The existing office and leisure centre is located between the links apartment building to the west and the bay apartment building to the east. The leisure centre was permitted under dcc reg. Ref. : 1539/02 & abp ref. : pl29s. 201622 and subsequently amended by dcc reg. Ref. 4445/18 and 2186/21. The development will consist of change of use of the first floor of the building as permitted under dcc reg. Ref. 4445/18 from office to leisure use and all ancillary works necessary to facilitate the development.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 14 May 2019. A completion certificate was lodged on 24 September 2023.

Notified floor area: 71.5

5 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 132 - The Links, Elm Park, Merrion RoadMay 2025€850,00041 m
Apartment 131, The Links, Elm ParkJul 2025€862,00041 m
Apt 112 - The Links, Elm Park, Merrion RoadAug 2025€850,00044 m
Apt 111 - The Links, Elm Park, Merrion RoadNov 2025€850,00044 m
Apt 154 The Links, Elm Park, Dublin 4Jul 2025€825,00047 m
50 Elm Park, Merrion Road, BallsbridgeMar 2026€410,00048 m
Apt 178 The Links, Elm Park, Dublin 4Mar 2026€820,00056 m
Apt 160, The Links, Elm ParkJun 2025€421,00056 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 June 2022
  2. Decision due18 August 2022
  3. Decision issued18 August 2022
  4. Grant issued3 October 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.