Planning Permission Ireland
GrantedAlterationsDecided 13 June 2022

6 Eustace Street, Dublin 2, D02 PD85

Upgrades and alterations to the atrium roof and supporting steel structure of a protected building.

3771/22 · Dublin City Council · Lodged 19 April 2022

Reference
3771/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
19 April 2022

Summary

AI-generated

The proposed works on this protected structure involve removing and replacing the glazing, framing, and valley gutters of the atrium roof. It also includes thermal and structural upgrades to the supporting steel structure, altering the roof profile angle, and modifying the adjacent lift motor room.

Alterationsprotected structureroof worksupgrade

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: planning permission for the development will consist of
  • The removal of the glazing framing and valley gutters to the atrium roof
  • The installation of new glazing, framing and valley gutters to the atrium roof
  • The thermal and structural upgrades of the existing supporting steel structure to the atrium roof
  • The above works necessitate altering the roof profiles from 40 to 33 degrees. The ridge height is to remain as existing at 15.90m. Above ordnance datum
  • Modifications to the lift motor room on the adjacent flat roof to facilitate drainage from the new atrium roof. And all ancillary works

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt.1, 17-19 Wexford Street, Dublin 2May 2026€1,800,00033 m
Apartment 4, 5-6 Temple Lane South, Temple BarNov 2025€355,00060 m
Apartment 5, 5-6 Temple Lane South, Temple BarNov 2025€355,00060 m
8 Printworks, Essex St, Dublin 2Feb 2025€290,00094 m
Apartment 5, 50-52 Dame Street, Dublin 2Nov 2025€395,00099 m
Apt 24 Sprangers Yard, Crowe St, DublinSept 2025€340,000107 m
3 Fownes St, Temple Bar, Dublin 2May 2026€1,600,000121 m
Top Floor Apt., 5a Fownes Street Upper, Temple BarOct 2025€250,000123 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 April 2022
  2. Decision due13 June 2022
  3. Decision issued13 June 2022
  4. Grant issued26 July 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.