Planning Permission Ireland
RefusedChange of useDecided 1 February 2019

4, Preston Street, Dublin 1

Renovation of a dilapidated building into eight apartments with a new rear extension.

4513/18 · Dublin City Council · Lodged 30 November 2018

Reference
4513/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
30 November 2018

Summary

AI-generated

The project involves renovating a dilapidated building and changing its use from offices to eight residential units (four one-beds and four studios). Works include removing a modern rear extension and chimney, constructing a new three-storey over basement rear extension with a roof terrace, and restoring historic features of the Protected Structure.

Change of userenovationextensionprotected structureapartments
Residential units
8
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: the development will consist of: (i) the renovation of an existing dilapidated building (as previously approved under reg. Ref. 5471/08 to include a change of use from office building to residential accommodation consisting of
  • No. One bedrooms and 4 no. Studio apartments (ii) the removal of existing chimney and non-original modern 2 storey extension to the rear ; (iii) the construction of a new 3 storey over basement extension to the rear with communal roof terrace with lift and stair core access at that level (iv) internal repairs & refurbishment works to the existing building at all levels: (v) extension to the second floor with brick facade to the front to match existing. (vi) reinstatement of main roof , timber sash windows , front entrance door , front railings and repair of all external elevations; and all associated site works necessary to facilitate the development

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 16 August 2021. A completion certificate was lodged on 25 October 2022.

Notified floor area: 354

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 1, 49/50 Amiens Street, Dublin 1Jan 2026€5,114,67866 m
5 Killarney Ave, Dublin 3, DublinMar 2026€310,000137 m
Apt 24 Montgomery Court, Foley St, Dublin 1May 2026€370,000143 m
Apt 2 - Second Floor, 36 Amiens St, Dublin 1Oct 2025€235,000150 m
Apt 8, Montgomery Court, Foley St Dublin 1Mar 2026€355,000157 m
16 The Foundry, Beaver Street, Dublin 1Aug 2025€406,000185 m
27 Killarney St, Dublin 1May 2025€1,020,000185 m
8 Killarney St, Dublin 1, DublinMay 2025€440,000196 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received30 November 2018
  2. Decision due1 February 2019
  3. Decision issued1 February 2019

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.