Planning Permission Ireland
GrantedAlterationsDecided 15 January 2024

2-4, O'Connell Street Lower, Dublin, D01 XH68

Removal of ATMs, signage, and external/internal bank fittings from a protected structure.

3776/23 · Dublin City Council · Lodged 17 May 2023

Reference
3776/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
17 May 2023

Summary

AI-generated

The development consists of external and internal works to a protected structure formerly used as an Ulster Bank. Works include the removal of ATMs, night safe plates, raised lettering, and internal bank signage, with stone and glazing replaced to match existing.

Alterationsprotected structurebankrefurbishment

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: permission to carry out external works on a protected structure for the removal of atm's in stonework and shopfront glazing with replacement stone and glazing to match existing. The removal of the night safe front plate, replacing with a blank steel plate, as well as the removal of the ulster bank shop front raised lettering and the removal of all blue ulster bank signage. Carry out internal works for the removal of the atm's, as well as the removal of loose furniture and general ulster bank signage and on all floors.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apartment 401, 5 - 9 Eden Quay, Dublin 1Nov 2025€490,00026 m
Apt 330, Bachelors Walk, DublinFeb 2025€285,00057 m
31 Batchelors Walk, Ashbourne, Co. MeathSept 2025€486,00092 m
110 Marlborough Street, Dublin 1Jun 2025€270,00094 m
84 Middle Abbey Street, Dublin 1May 2025€1,000,000144 m
Apt 3 Lafayette Building, 1 5 Dolier St, DublinOct 2025€400,000158 m
171 Batchelors Walk, DublinJan 2026€277,000172 m
Apt 140 Bachelors Walk, Bachelors Walk, Dublin 1Mar 2026€312,500172 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received17 May 2023
  2. Decision due16 January 2024
  3. Decision issued15 January 2024
  4. Permission expiry31 March 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.