Planning Permission Ireland
GrantedInfrastructureDecided 16 December 2019

Canal Way Educate Together, Basin View, Dublin, 8

Demolition of a cycle shelter and construction of a temporary two-storey prefabricated school block.

3843/19 · Dublin City Council · Lodged 22 August 2019

Reference
3843/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
22 August 2019

Summary

AI-generated

The project at Canal Way Educate Together involves the demolition of an existing cycle shelter. It will be replaced with a temporary, two-storey prefabricated school block containing six classrooms, alongside widened entrance gates.

Infrastructureschoolprefabricateddemolition
Storeys
2
Floor area
475 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The development will consist of
  • The demolition of the existing cycle shelter to the north of the site
  • The provision of a new temporary, two storey prefabricated block - approx. 475 sqm total area - comprising 6 no. Mainstream classrooms, ancillary accommodation and sanitary facilities with obscured glazing to the windows on the first floor northern elevation
  • The repositioning and widening of the entrance gates from basin view and
  • All associated site and drainage works

Land-use zoning

What this land is zoned for

Z15: Community and Social InfrastructureCI
To protect and provide for community uses and social infrastructure.

National zoning type: Mixed/general community services/facilities uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 20 November 2020. A completion certificate was lodged on 1 November 2021.

Notified floor area: 475

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
7a Basin Lane, James St, Dublin 8Jul 2026€420,00042 m
19 Longs Place, Rialto, Dublin 8May 2025€350,00070 m
13 Longs Place, Longs Lane, Dublin 8Jul 2025€2,490,00074 m
11 Pim St, Dublin 8Aug 2025€420,00095 m
6 The Granery, Pim St, Dublin 8Feb 2025€296,00099 m
Apt 14 The Granary, Longs Place, Dublin 8Dec 2025€320,00099 m
32 Liberty View, Longs Place, Dublin 8Jan 2025€255,000116 m
Apt 26 Liberty View, Pim St, Dublin 8Mar 2025€170,000116 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 August 2019
  2. Further information requested15 October 2019
  3. Further information received22 November 2019
  4. Decision due19 December 2019
  5. Decision issued16 December 2019
  6. Grant issued28 January 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.