Planning Permission Ireland
GrantedAlterationsDecided 4 March 2020

Dolphin House, Irishtown Road, Dublin 4, D04 HD26. (A Proteced Structure - RPF Ref. No. 4003)

Refurbishment and reconfiguration of Dolphin House for office and showroom use, including a new lightwell and mezzanine.

3875/19 · Dublin City Council · Lodged 28 August 2019

Reference
3875/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
28 August 2019
Floor area
26 m²

Summary

AI-generated

The works to this protected structure include the refurbishment of ground floor offices and the change of use of the main hall to a showroom and open-plan offices. A double-height lightwell will be constructed between the front and rear buildings, alongside a new reversible internal mezzanine floor. Internal alterations will also divide the ground and first floors into independent units.

Alterationsofficerefurbishmentheritage

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: permission for the following works
  • Refurbishment and reconfiguration of the existing ground floor offices to the ground floor of the two storey front building, the change of use of the main hall at ground floor level from a work-man's social club (last used as such 25 years ago) to a showroom/open plan offices/training room. The ground floor unit will now be independent from the first floor
  • Refurbishment and reconfiguration of the existing first floor level offices. The first floor unit will now be independent from the ground floor and be accessed from the existing side entrance
  • The construction of a double height lightwell between the front 2 storey building and the single storey rear showroom/open plan offices/training room
  • The construction of a reversible internal mezzanine floor to the rear ancillary to the showroom/open plan offices/training room. The floor area will increase from 270 sq. M to 296 sq. M
  • Internal alterations comprising: - alterations to stairs and blocking up at the bottom of the stairs to divide the ground floor from first floor. - removal of sections of wall between the two front rooms and rear rooms to create openings. - construction of new walls to create office and wc's. - blocking up between the new wc and new disabled wc. Removal of the ground floor to provide new insulated polished concrete floor. - the removal, repairing and replacing the existing timber panelling throughout. - breathable thermal plaster applied directly to the inside of walls throughout
  • External alterations comprising: - existing original sections of boundary wall and plinth retained and made good and non-original sections replaced with new. - existing original sections of boundary railings retained and made good and non-original sections replaced with new. - new automated driveway gate with dishing to path at entrance. - removal of all tarmac and hardscaping to perimeter of the building and replaced with new soft and hardscaping - cleaning, raking out and re-pointing of all brickwork to all elevations and boundaries. - removal and the replacement of all external doors and windows with aluminium. - removal and the replacement of rainwater goods with extruded aluminium. - alterations to 4 windows and one external door to the south elevation. Alterations to one window to the north elevation. - making good and replacing as required of non-original slates to the roofs. - fibre glassing the existing flat roofs
  • All associated site works. At dolphin house, irishtown road, dublin 4, d04 hd26 (a protected structure - rps ref. No. 4003)

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 30b The Bottleworks, Dermot Ohurley Ave, Irishtown Dublin 4May 2026€530,00046 m
48b The Bottleworks, Dermot Ohurley Ave, Irishtown Dublin 4Jun 2025€345,00046 m
Apt 22 C, The Bottleworks, IrishtownJan 2026€467,00048 m
Apt 12, Summerfield, Irishtown Rd Dublin 4Oct 2025€400,00055 m
Apt 32 Block A, The Bottle Works, Dermot O'Hurley AvenueApr 2026€492,00056 m
Apt 42 Block A, Riverview Court, The BottleworksMar 2025€500,00056 m
10 A The Bottleworks, Dermot O Herlihys Road, IrishtownNov 2025€450,00056 m
Apt 39 Riverside, The Bottleworks, Irishtown Dublin 4May 2025€475,00057 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received28 August 2019
  2. Further information requested22 October 2019
  3. Further information received10 February 2020
  4. Decision due6 March 2020
  5. Decision issued4 March 2020
  6. Grant issued8 June 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.