Planning Permission Ireland
GrantedChange of useDecided 15 January 2019

Existing vacant retail unit, Ground Floor West, Kings Building, 152-155, Church Street, Dublin 7

Change of use of a vacant ground floor retail unit to a restaurant with new signage and ventilation.

3885/18 · Dublin City Council · Lodged 6 September 2018

Reference
3885/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
6 September 2018

Summary

AI-generated

The development will convert a vacant ground floor retail unit into a restaurant featuring a kitchen, seating area, and service area. The works also include internal decal signage, an external logo sign, and air conditioning vents on two facades.

Change of useretailrestaurantcommercial

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of the change of use of the ground floor retail unit to restaurant, comprised of kitchen, provision of sanitary accommodation, service area and seating area within the existing ground floor unit. Signage is proposed as vertical surface applied decal placed internally behind existing glazing and a surface mounted logo sign placed on external wall beside door entrance. Permission is also sought for installation of air conditioning grill vents at high level on both the may lane & bow street facades.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 4, Smithfield Village, Smithfield Dublin 7Mar 2026€431,00024 m
Apt 23, Smithfield Village, Smithfield Dublin 7Feb 2025€480,00024 m
37 Smithfield Village, Dublin 7Nov 2025€445,00055 m
Apt 76 Block D, Smithfield Village, Dublin 7Jun 2026€475,00055 m
42 E Coopers Sq, Smithfield, Dublin 7Mar 2025€495,00093 m
161garden Court, Smithfield Village, SmithfieldFeb 2025€280,000102 m
165 Smithfield Village, Smithfield, Dublin 7Aug 2025€370,000107 m
155a Garden Court, Smithfield Village, Dublin 7May 2026€337,500107 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received6 September 2018
  2. Further information requested31 October 2018
  3. Further information received10 December 2018
  4. Decision due15 January 2019
  5. Decision issued15 January 2019
  6. Grant issued19 February 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.