Planning Permission Ireland
GrantedAlterationsDecided 21 October 2021

The Courtyard, The Old Jameson Distillery, Bow Street, Dublin 7

Replacement of the pot still feature with an illuminated sculpture at the Old Jameson Distillery.

3128/21 · Dublin City Council · Lodged 9 July 2021

Reference
3128/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
9 July 2021

Summary

AI-generated

Permission is sought to replace the existing pot still feature in the courtyard of the Old Jameson Distillery with a free-standing illuminated sculptural feature. The site is a protected structure.

Alterationsprotected structuresculpturetourism

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: permission for the replacement of the existing pot still feature in the courtyard, the old jameson distillery, bow street, dublin 7, d07 v57c with a free standing illuminated sculptural feature and all ancillary site development works. The proposed development consists of or comprises the carrying out of works to a protected structure.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 12 October 2022.

Notified floor area: 16

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 76 Block D, Smithfield Village, Dublin 7Jun 2026€475,00024 m
37 Smithfield Village, Dublin 7Nov 2025€445,00024 m
161garden Court, Smithfield Village, SmithfieldFeb 2025€280,00044 m
165 Smithfield Village, Smithfield, Dublin 7Aug 2025€370,00053 m
155a Garden Court, Smithfield Village, Dublin 7May 2026€337,50053 m
Apt 23, Smithfield Village, Smithfield Dublin 7Feb 2025€480,00054 m
Apt 4, Smithfield Village, Smithfield Dublin 7Mar 2026€431,00054 m
Apt 218 Centre Court, Smithfield, Dublin 7Jul 2025€308,00059 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received9 July 2021
  2. Further information requested2 September 2021
  3. Further information received24 September 2021
  4. Decision due21 October 2021
  5. Decision issued21 October 2021
  6. Grant issued6 December 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.