Planning Permission Ireland
GrantedRetentionDecided 24 October 2019

Former Chief O'Neill's Hotel, Smithfield Square, Dublin 7

Retention of a change of use from office to hostel accommodation at a protected structure in Smithfield.

3895/19 · Dublin City Council · Lodged 30 August 2019

Reference
3895/19
Authority
Dublin City Council
Register status
Decided
Type
Retention Permission
Received
30 August 2019
Floor area
8 m²

Summary

AI-generated

Retention permission is sought for a change of use of part of the ground floor office space to hostel accommodation, creating a new 8-bed dorm. The application also seeks retention for an additional 12 bed spaces within existing bedrooms at the former Chief O'Neill's Hotel, which is a protected structure.

Retentionhostelheritageretention

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure & retention: retention permission at this site, the former chief o'neill's hotel, smithfield square, dublin 7 (protected structure). The development proposed consists of retention permission for a change of use as it relates to part of the ground floor office space, occupying a section of the western curved glass facade wrapping around the original brick chimney, from office to hostel accommodation use, creating a new 8 bed space dorm of a total area of 37 sqm. The retention permission also relates to a further increase of the total number of bed spaces by 12 bed spaces within existing bedrooms.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
161garden Court, Smithfield Village, SmithfieldFeb 2025€280,00022 m
Apt 218 Centre Court, Smithfield, Dublin 7Jul 2025€308,00045 m
193 Smithfield Village, Smithfield, Dublin 7Dec 2025€285,00045 m
188 Smithfield Village, Dublin 7Apr 2025€275,00045 m
209 Smithfield Village, Dublin 7, DublinFeb 2025€380,00045 m
42 E Coopers Sq, Smithfield, Dublin 7Mar 2025€495,00055 m
37 Smithfield Village, Dublin 7Nov 2025€445,00058 m
Apt 76 Block D, Smithfield Village, Dublin 7Jun 2026€475,00058 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received30 August 2019
  2. Decision due24 October 2019
  3. Decision issued24 October 2019
  4. Grant issued10 December 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.