Planning Permission Ireland
GrantedAlterationsDecided 30 June 2022

7-8, Wilton Terrace, Dublin, 2.

Alter the front entrance, replace doors and panels, and install a new brise soleil system.

3904/22 · Dublin City Council · Lodged 6 May 2022

Reference
3904/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
6 May 2022

Summary

AI-generated

The development consists of altering the front southeast entrance. Works include replacing a glazed door and panel with a full-height glazed door and stainless steel directory panel, alongside installing a new brise soleil system with building signage at first-floor level.

Alterationsofficefacadesignage

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Development will consist of the alteration to the entrance on the front southeast elevation on to wilton terrace. The works will include the removal of an existing glazed door with panel above and replacement with full height glazed door , a single glazed panel to the left of the door will be replaced with a new stainless steel panel incorporating building directory, post box and access control. In addition, a new brise soleil system with supporting metal frame at first floor level incorporating building signage built flush with existing building facade is proposed.

Land-use zoning

What this land is zoned for

Z6: Employment/EnterpriseSI
To provide for the creation and protection of enterprise and facilitate opportunities for employment creation.

National zoning type: Industrial, enterprise, employment

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
7 Court Apts, Wilton Place, Dublin 2Mar 2025€450,00069 m
Apt 1, Baggot Bridge Court, Pembroke Row Dublin 2Dec 2025€470,00090 m
Top Floor Apt, 87 Lower Baggot St, Dublin 2Dec 2025€435,000102 m
2 Bagod Rath Apts, Pembroke Row, Dublin 2May 2026€435,000108 m
Apt 14, 55 Lad Lane, Dublin 2price excludes VATJan 2025€779,736175 m
Apt 4, 55 Lad Lane, Dublin 2price excludes VATJun 2025€845,815175 m
Apt 8, 55 Lad Lane, Dublin 2price excludes VATJan 2025€916,299175 m
Apartment 25, 55 Lad Laneprice excludes VATJan 2025€1,365,639175 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received6 May 2022
  2. Decision due30 June 2022
  3. Decision issued30 June 2022
  4. Grant issued12 August 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.