Planning Permission Ireland
GrantedAlterationsDecided 19 November 2018

1, Grand Canal Quay, Dublin 2

Install new rooftop and courtyard plant equipment with linear grills at Grand Canal Quay.

4028/18 · Dublin City Council · Lodged 27 September 2018

Reference
4028/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
27 September 2018

Summary

AI-generated

The development consists of installing new plant equipment at roof level and within a rear ground floor courtyard enclosure. It also includes adding linear grills along the south elevation facing the DART line.

Alterationsofficeplantinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development at this site 1 grand canal quay, dublin
  • The development will consist of installation of new plant at roof level, new plant and associated plant enclosure at rear ground floor courtyard and additional linear grills to match existing along south elevation facing towards the dart line at 1 grand canal quay, dublin 2

Land-use zoning

What this land is zoned for

Z14: Strategic Development and Regeneration Areas (SDRAs)RS
To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

National zoning type: Residential, mixed residential and other uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 31 August 2018.

Notified floor area: 5,396

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
13 Carlingford Parade, Macken St, Dublin 2Nov 2025€577,000156 m
1 Island Villas, Grand Canal St Lower, Dublin 2Jul 2025€420,000171 m
3 Island Villa, Grand Canal Street Lower, Dublin 2Nov 2025€720,000174 m
5 Island Villa, Off Lwr Grand Canal St, Dublin 2Oct 2025€470,000176 m
7 Island Villa, Grand Canal St, Dublin 2Feb 2025€368,000179 m
12 Dock Mill Apts, Barrow St, Dublin 4Jun 2025€672,000191 m
Apt 4, The Dock Mill, Barrow St Dublin 4Sept 2025€385,000191 m
61 Dockmill, Barrow St, Dublin 4May 2025€560,000191 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received27 September 2018
  2. Decision due21 November 2018
  3. Decision issued19 November 2018
  4. Grant issued4 January 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.